Laserfiche WebLink
DISCUSSION <br /> The JEPA identifies the criteria to establish prioritization for projects, giving guidance to use a project's <br /> effectiveness, current funding and readiness. Although not finalized, the Strategic Expenditure Plan Sub- <br /> committee has outlined a method to use each of the three criteria to establish project priority for List A <br /> and List B projects. <br /> While the TVTC has also supported the funding priority of List A projects before funding List B projects <br /> verbally, no formal decision has been made regarding the continued separation of the two lists. <br /> Table 1 shows the ranking of the List A projects that have yet to be fully funded using the criteria and <br /> method established by the Sub committee. <br /> TABLE 1- Prbridrticn of List A .acts Not FU Funded <br /> �a r <br /> �ListA a <br /> D Pr2b Isabel Route 84A580Irt- EZ 2.9 3 2.7 <br /> ©A 103 <br /> Vasa, Road Saf kn. ovenents Phase 1 -s $4.15 Z 3 2.4 <br /> 1111MINI Rwae 84 Li a 1 1580 to 1580 5.88: 4 17.80 1 Z. 2 2.65 <br /> 0ga=I-680Aadli Lanes -e meet Y• 40 1.01 1.5 27 <br /> I- 58aFoofiilbsan Ramon RDad Metthange $0.60 111 1 1.8 <br /> 6 9a CrowC. on R,ad Improvements Phase 1 kFTT 10.95 O.e®. 1 It <br /> fl A1Cb VascoRoadSaf- Improsenents Phase 2 c r $25.83 0 as 2.4 <br /> 8 A-11 iress Bus/Bus R:.'. Transit 'Phase T TBD) ltd 0 1 17 <br /> 9 A-9b Crow Carryon Road improvements Phase 2 r $32.34 0 0.5 1.5 <br /> Table 2 shows the score and ranking of List B projects. <br /> TABLE 2- Prioritization of List B Projects C� <br /> MI LIST pfr <br /> 10 B8 Jadc Landon Boulevard Extension $823 2.47 3 14 <br /> EN B -10 4880 Southbound HOV Lane Closure, North Main 521.50 1.93 1 2.8 <br /> 8.3 1580/Rrst Street Irt- e Matilcatian 'c 3 $4.20 2.81 1 2 <br /> B4 I- 580Nasco ROadkiwche Moddl®Wn E7 511.38 2 M 21 <br /> m B-5 1-580/Greenville Road Interchange Modification <br /> B•8 safe Camino Tess Widen East&ackhewk $44.92 225 0.5. 21 <br /> 18 B8 .-'nn Canino Tess are Vide e. East Bladhe $44.92 2.35 .0.5 1.8 <br /> m 8-1 t580-680lnterchene- tbandtosouthbwi. r $757.50 0.01' as 29 <br /> m B-11a 1880. ress Bun/HON On- and 0ff-R: 97200 0.37" 1 2.1 <br /> El B-2 Rfth Pastboud lane on 1580fram Santa Rita to Vas. g 5131.30 0 0.5. 29 <br /> 20 B•7 R Charro Road EMension 67.01.7 $30.15 0.90 0.5 1.4 <br /> B-11b I-880 Transit Cando Impwererts y TA B' 5100.00 0 0.5 1.4 <br /> There has been some discussion at the TVTC to treat lists A and List B projects equally to create a single <br /> master list of projects or to provide special circumstances that would allow a project on List B to move <br /> above projects in List A. <br /> Table 3 shows the combination of the two Lists into a single master list and sorted by cumulative score to <br /> better understand how the projects would be ranked. <br /> Page 2 of 4 <br />