My WebLink
|
Help
|
About
|
Sign Out
ORD 1109
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1101 - 1200
>
ORD 1109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2006 1:36:17 PM
Creation date
3/17/1999 6:32:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1109
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />b.7 Fact. Economic impact of wastewater connection <br />and use fees will encourage minimization of <br />industrial water use. There is sufficient water <br />supply to meet the projected demand. <br /> <br />C. Significant Effect. Generation of sewage effluent <br />beyond capacity availabl~ to the site. <br /> <br />c.l Finding. The mitigation measure incorporated <br />into the Project to control generation of sewage <br />effluent will substantially lessen the effect. <br /> <br />c.2 Fact. Condition No. 21 provides that building <br />permits may be withheld by the City if sewer <br />capacity is not available. <br /> <br />c.3 Fact. See Sections IV.b.2 and IV.b.7 (Water <br />saving measures which minimize effluents). <br /> <br />c.4 Findinq. A mitigation measure which has not <br />been incorporated into the Project concerning <br />construction of other sewer effluent disposal <br />facilities is not within the jurisdiction of <br />City. The recommended mitigation measure is <br />within the jurisdiction of other pUblic agencies <br />and can and should be adopted. <br /> <br />c.5 Fact. Construction of sewer effluent trans- <br />portation and disposal facilities is within the <br />control of DSRSD, LAVWMA and EBDA. As a member <br />agency in LAVWMA and by agreement with DSRSD, <br />City may participate in the decisions to expand <br />facilities, and, pursuant to existing General <br />Plan pOlicies, City has urged such construction. <br /> <br />c.6 Findinq. The Reduced Intensity of Development <br />Alternative, No Project Alternative, Partial <br />Approval Alternative or Mixed Use Alternative <br />could partially mitigate the effect. However, <br />each of these Alternatives is infeasible and <br />unnecessary as effects concerning water use <br />demand are significantly lessened by the miti- <br />gation measures incorporated into the Project. <br /> <br />c.7 Fact. See Section XII (for infeasibility of <br />Alternatives). <br /> <br />c.8 Fact. See Sections IV.c.2 and IV.c.3 (Sewer <br />effluent mitigation). <br /> <br />10. <br />
The URL can be used to link to this page
Your browser does not support the video tag.