Laserfiche WebLink
Implementation Regulations <br /> Growth Limitation Plan <br /> APPENDIX A <br /> TRAFFIC WEIGHTED POINT SYSTEM <br /> 1. All projects must achieve a "Minimum Qualifying Point Score" on a 100 point scale <br /> (described below) in order to receive an Allocation Reservation. Projects which <br /> demonstrate, by a traffic study, that city adopted Roadway Level of Service Standards are <br /> met or maintained automatically qualify for an Allocation Reservation. Projects which <br /> cannot demonstrate attainment of roadway level of service standards will have points <br /> deducted as peak hour trips increase. <br /> 100 <br /> Minimum I <br /> qualifying 85 1. 85 points (Office Residential)* <br /> point score <br /> (established 80 j 80 points (Retail Other Commercial) <br /> by Council) <br /> I <br /> (1 <br /> Peak Hour Trip Reduction Rate <br /> I I toy.N375T POINTS <br /> 1 1 1 ft- <br /> NOT TO SCALE 56 75 375 <br /> PEAK HOUR TRIP GENERATION <br /> 1 <br /> Office includes general, professional, administrative, executive and medical offices <br /> including clinics not located in a Hospital land use district. <br /> Retail Commercial includes all other non -office uses except Community Facilities. <br /> NNPHT means Net New PM Peak Hour Trips. <br /> Maximum Point <br /> Preference Criteria Value I <br /> (Est. by Council) <br /> General <br /> a) Projects that remove blighted conditions 30 <br /> Commercial Development <br /> b) Commercial development which implements the City's 15 <br /> economic development goals <br /> c) Commercial development which creates opportunities for high 15 <br /> paying jobs <br /> d) Projects which are expansions of existing businesses 15 <br /> e) Projects which enhance neighborhood retail options 15 <br /> 18 <br />