My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
110309
>
15 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2009 11:02:27 AM
Creation date
10/30/2009 10:58:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
11/3/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Implementation Regulations <br /> Growth Limitation Plan <br /> his /her behalf may be rebuilt on the same site, with up to the same amount of <br /> square footage or number of dwelling units that originally existed on the site prior <br /> to destruction (January 1990 or later), regardless of the floor area ratio or <br /> residential density range designated in the General Plan. If the land use is <br /> inconsistent with the current General Plan land use designation, and more than <br /> 50% of the value of the structure was destroyed, the Planning Commission may <br /> approve a Conditional Use Permit to allow the use to continue if it can make the <br /> necessary findings as specified in the Municipal Code. <br /> If the applicant wishes to change the land use after the structure was destroyed, the <br /> proposed project must comply with the Growth Limitation Plan and development <br /> standards in effect at the time the application is deemed complete. If the proposed <br /> use requires a General Plan Amendment and Rezoning, the applicant is given <br /> credit for the same number of peak hour trips that were generated by the previous <br /> project that was destroyed (January 1990 or later), as long as the size of the <br /> building does not exceed what is permitted on the site under the current floor area <br /> ratio (see Section VI, "Land Use Changes <br /> C. Partially Completed Structures <br /> Projects which are under construction, but are not yet complete, are exempt from <br /> the roadway level of service standards for the amount of square footage that was <br /> approved for the original project. <br /> If the structure is changed to another use consistent with the prevailing General <br /> Plan land use designation, and is permitted or conditionally permitted under a <br /> zoning designation within that General Plan category, the project is exempt for the <br /> same amount of square footage or dwelling units that were originally approved, <br /> but is not exempt for any new square footage or dwelling units. When <br /> considering a request for a Conditional Use Permit, the Planning Commission <br /> may review the number of peak hour trips generated by the proposed land use, <br /> assess the use against the preference criteria, and compare the proposed use to the <br /> existing use, before granting a Conditional Use Permit. <br /> If a General Plan change is requested and approved, the applicant is given credit <br /> for the same number of peak hour trips that would have been generated by the <br /> approved project. <br /> All net new development over the amounts originally approved will be deducted <br /> from the commercial or residential development caps. Residential units <br /> demolished for a non residential use will be added back into the residential <br /> development cap; commercial square footage demolished for a non commercial <br /> use will be eliminated and will not be credited to the commercial development <br /> cap. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.