Laserfiche WebLink
CITY OF PLEASANTON SCOPE OF SERVICES <br /> UNDERGROUND UTILITY DISTRICT <br /> FOR STANLEY BLVD. RULE 20B <br /> showing critical path. Schedule shall be updated on a regular basis to <br /> keep the City informed of the project status <br /> 2.2 Project Management "CONSULTANT" shall provide project <br /> management services until design is completed. Project management <br /> includes coordinating between subconsultants, utility companies, city staff, <br /> and property owners. <br /> 3 Base Mapping Preliminary Design <br /> 3.1 Base Mapping "CONSULTANT" will use the Old Stanley Boulevard <br /> Reconstruction dated June 2008 "OSBR- 2008" CAD base for the <br /> Underground Utility Project. The matching CAD base from OSBR -2008 <br /> will also be useful for designing new PG &E Vaults in locations which are <br /> compatible to the design for the OSBT -2008 project (sidewalks, driveways <br /> and streetlight locations will be considered). The OSBR -2008 CAD files <br /> include utility linework and topographic survey points, which will be used <br /> to identify the best alignment for the Joint Trench Project "PROJECT <br /> 3.2 Map Existing Overhead Connections "CONSULTANT" will add to the <br /> CAD Base mapping for 31 properties that includes the following overhead <br /> utility information a) telephone connection points, b) cable connection <br /> points, c) electrical connection points, d) service box locations, e) house <br /> foot print and other existing features along the service connection route. <br /> Also added the AutoCAD Base file will be existing overhead powerlines on <br /> Stanley Blvd. "CONSULTANT" shall distribute base maps for each <br /> individual property to the design team. <br /> 3.2 Conceptual Joint Trench Layout "CONSULTANT" will prepare <br /> preliminary design of the Joint Trench alignment along with utility vault <br /> locations. As part of this proposal process, "CONSULTANT" prepared a <br /> schematic hand -drawn trench layout. "CONSULTANT" identified a <br /> possible trench location 5' north of the existing waterline. This alignment <br /> will be considered because the trench construction is in the shoulder of <br /> the road, and avoids power poles and existing utilities. "CONSULTANT" <br /> will contact utility companies to obtain information related to existing <br /> underground utilities. The "CONSULTANT" design of the Joint Trench <br /> alignment is sensitive to the number of conduits in the trench and the <br /> sizing of the vaults. Therefore PG &E electrical designs are needed prior <br /> to each submittal phase. <br /> During our initial site investigations we noted: gas line, water line, sanitary <br /> sewer, and utility manholes. We recommend close discussion and <br /> approval by Mr. Mike Fulford regarding hand trenching requirements near <br /> the existing trees to remain. <br /> BELLECCI ASSOCIATES, INC JULY 10, 2009 <br />