My WebLink
|
Help
|
About
|
Sign Out
ORD 1246
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1201 - 1300
>
ORD 1246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 10:09:05 AM
Creation date
3/17/1999 4:56:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1246
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
capacity). City agrees that to the best of its ability <br /> it shall impose the cost of traffic mitigation measures <br /> made necessary by the cumulative impact of north <br /> Pleasanton development on a pro-rata basis over north <br /> Pleasanton properties benefiting therefrom. <br /> <br /> c. Site Specific Traffic Studies. Each site specific <br /> project submitted to the City for final design approval <br /> shall be accompanied by a traffic study, prepared in <br /> accordance with the City's adopted Standard Assumptions <br /> for Traffic Studies and satisfactory to the City <br /> Engineer, projecting future levels of service at the <br /> above-described affected intersections. Future traffic <br /> conditions shall include existing traffic, projected <br /> traffic from other projects under construction and/or <br /> having received final City approvals, and projected <br /> traffic from the project submitted for approval. The <br /> street network assumed shall be that existing at the <br /> time the project is submitted for approval and as it <br /> will exist as a result of roadway improvements either <br /> under construction or having received necessary final <br /> governmental approvals. <br /> <br /> (i) If the traffic study analysis shows that any <br /> affected intersection, or intersections, would <br /> exceed LOS D (equal to or greater than 91% of <br /> capacity) but can be mitigated so as to be no <br /> greater than mid-LOS D (86% of capacity), after <br /> mitigations, the City shall condition approval upon <br /> implementation, of those mitigation measures. No <br /> building permit may be issued until the mitigation <br /> measures are either under construction or, for site <br /> specific or occupant-specific mitigation measures <br /> not construction-related (such as TSM), the <br /> implementation programs are established. If the <br /> City Engineer finds that completion of a particular <br /> improvement not yet under construction will <br /> reasonably be completed prior to occupancy of a <br /> project building, that the improvement has received <br /> all approvals necessary, from whichever agencies, <br /> and that funding is bonded for or otherwise <br /> assured, a building permit may be issued in advance <br /> of the start of construction of the mitigation <br /> measure. <br /> <br /> (ii) If the traffic study analysis shows any affected <br /> intersection, or intersections, would exceed LOS D <br /> (equal to or greater than 91% of capacity), and <br /> indicates that there are no mitigation measures the <br /> Developer can implement to improve that <br /> intersection(s) to mid-LOS D (86% of capacity), <br /> then the City shall not approve the project <br /> application. <br /> <br />17. Groundwater Test Wells. The developer shall install test <br /> wells within the project site; scheduled groundwater <br /> <br />Conditions of Approval PUD-85-8 <br />February 1986 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.