Laserfiche WebLink
c.1 Finding. Exterior mitigation measures to meet <br /> local standards would conflict with the 1-580 <br /> Scenic Highway Plan. <br /> <br /> c.2 Fact. The 1-580 Scenic Highway Plan seeks <br /> retention of vistas while allowing economically <br /> feasible sound mitigation, so long as federal <br /> regulations are met. <br /> <br /> c.5 Finding. The No Project Alternative, the Reduced <br /> Intensity Alternative and the Mixed-Use <br /> Alternative, which could partially mitigate the <br /> significant noise effects, are infeasible. <br /> <br /> c.6 Fact. See Section XII (infeasibility of <br /> alternatives). <br /> <br />VI. Public Services. <br /> <br /> A. Significant Effect. Water use demand will exceed Zone <br /> 7's water supply from existing State water projects for <br /> Scenario 2 demand. <br /> <br /> a.1 Finding. The mitigation measures incorporated into <br /> the Project to require water conservation will <br /> substantially lessen this effect. <br /> <br /> a.2 Fact. Condition 21 requires the Project to install <br /> water conserving plumbing features as part of the <br /> Building Code. <br /> <br /> a.3 Finding. Additional mitigation measures identified <br /> in the EIR (completion of State water facilities, <br /> extension of EBMUD to Dublin and Pleasanton and use <br /> of the groundwater basin) are subject to the <br /> jurisdiction of other public agencies and can and <br /> should be enforced by such agencies. <br /> <br /> a.4 Fact. The Livermore-Amador Valley groundwater <br /> basin is subject to Zone 7 jurisdiction and can be <br /> operated to meet deficiencies. <br /> <br /> a.5 Fact. The County of Alameda and Zone 7 have <br /> jurisdiction to create a Chain-of-Lakes. <br /> <br /> a.6 Finding. The No Project Alternative, the Reduced <br /> Intensity Alternative, and the Mixed Use <br /> Alternative, which could partially mitigate the <br /> significant effects, are infeasible. <br /> <br /> a.7 Fact. See Section XII (infeasibility of <br /> alternatives). <br /> <br /> B. Significant Effect. EBMUD's projected water supply will <br /> not be adequate for Scenario 2 demand, and may not be <br /> adequate for Scenario 1 demand. Scenario 2 demand would <br /> <br /> - 8 - <br /> <br /> <br />