Laserfiche WebLink
cost at this time, with eventual pa~vrnent, if contemplated in the Specific Plan, <br />taking place as development occurs, as originally contemplated. <br /> <br />PG&E has planned a 230KV transmission line in the Vineyard Corridor and has <br />received approval from the State of California Public Utilities Conxrnission to <br />construct this line in the new right-of-way of Vineyard Avenue. if available by <br />July 1, 2002, or, if not within the existino ri.oht-of-wav The Cfi'< the District. <br />and property owners prefer this line to be constructed in the realigned Vineyard <br />Avenue right-of-way, which requires advance dedication of the right-of-way and <br />~ading of the roadway._(_2nce that 2 <br /> <br />Property Owner desires to enter into this Development Ageement to obtain <br />assurance that the Specific Plan and other existing project approvals will remain <br />in effect so the Project can proceed when economic conditions t~arrant. In <br />addition, Property Owner desires to enter into this Development Agreement to <br />assist in providing a coordinated and systematic approach to bringing the <br />infrastructure necessary for development of all parcels within the Vineyard <br /> <br />Revision ;~t¢-,=~ Draft Hahner Development Ageement Page 5 ot'~)_x* ~' <br /> <br /> <br />