Laserfiche WebLink
Resolution No. PC-01-17 <br />Page 10 <br /> <br />17. <br /> <br />Any proposed outdoor lighting for the subject property shall be of low intensity, <br />less than a 70 watt point source, in order to minimize its visibility. Outdoor <br />lighting shall also not glare onto adjacent properties. <br /> <br />18. <br /> <br />The applicants are encouraged to comply with the energy efficiency guidelines of <br />the U.S. Green Building Council, where applicable, and to incorporate Green <br />Building concepts for use of recycled materials and diversion of waste materials. <br /> <br />19. <br /> <br />Prior to installation of the proposed storm drain line, the applicants shall obtain <br />and/or provide proof of a drainage easement from the adjacent property owner at <br />4100 Foothill Road (Yee) allowing the proposed storm drain line to connect at the <br />access road. The text of this easement shall be subject to the review and approval <br />of the City Attorney and Planning Director. <br /> <br />20. <br /> <br />At the time that the access road offFoothill Road is maligned per the approved <br />PUD plan for the Equus Court development (PUD-98-01), or as modified in the <br />future, the applicants shall abandon the portions of the access easement that <br />would no longer be necessary. <br /> <br />Specific Conditions For Proposed House on Lot 1 <br /> <br />21. <br /> <br />Final inspection by the Planning Department of the structure, grading, and <br />preservation of existing trees is required prior to occupancy of the house. <br /> <br />22. <br /> <br />All landscaping indicated on the plans shall be installed by the <br />applicant/homeowner prior to occupancy. <br /> <br />23. <br /> <br />The plan check materials will be accepted only after the effective date of the <br />project approval (30 days from City Council adoption of the ordinance), unless <br />the applicant submits a signed statement acknowledging that the plan check fees <br />may be forfeited in the event that the approval is overturned or the design is <br />significantly changed as the result ora lawsuit. In no case will a building permit <br />be issued prior to the expiration of the 30-day effective period. <br /> <br />24. <br /> <br />To initiate the building permit plan check process, the applicant shall submit the <br />following: <br /> <br />a. Three (3) full-size sets of construction plans (wet-stamped and signed); <br /> <br />b. Two (2) sets of the necessary structural and Title 24 calculations; <br /> <br />c. Two (2) copies of a site specific soils report; <br /> <br />d. The completed Building Permit Questionnaire; and <br /> <br />e. The necessary fees. <br /> <br /> <br />