My WebLink
|
Help
|
About
|
Sign Out
PC 2001-06
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2001
>
PC 2001-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:40 AM
Creation date
3/8/2002 9:34:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/14/2001
DOCUMENT NO
PC 2001-06
DOCUMENT NAME
PUD-01
NOTES
MARDEL LLC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
97. <br /> <br />98. <br /> <br />99. <br /> <br />100. <br /> <br />101. <br /> <br />102. <br /> <br />103. <br /> <br />104. <br /> <br />105. <br /> <br />106. <br /> <br />oper's engineer shall demonstrate to the satisfaction of the City Engineer that the 1 O-year <br />storm event is contained within the "V"-ditch. <br /> <br />For Court "A", the median island located in the middle of the cul-de-sac bulb shall be <br />maintained by the homeowner's association. <br /> <br />For Section "K-K", there shall be a concrete "V"-ditch located behind the two-foot (2' <br />0") retaining wall. The "V"-ditch shall be connected to storm drain system. This detail <br />shall be shown on the tentative subdivision map submitted for review and approval by the <br />Planning Commission. <br /> <br />Prior to approval of the final subdivision map, the project developer shall post with the <br />City an additional performance bond for all private subdivision improvements not subject <br />to acceptance by the City of Pleasanton. <br /> <br />The water and gravity sanitary sewer mains shall be public and maintained by the City. <br />There shall be individual sanitary sewer and water laterals to each dwelling unit. There <br />shall be a two-way clean-out on the gravity sanitary sewer lateral located at the back of <br />the Public Service Easement. <br /> <br />The project developer shall work with City Staff prior to the submittal of the tentative <br />subdivision map to finalize the location of the sewer pump station serving the Vineyard <br />Corridor. In the event this cannot be located on the Lonestar property, the project devel- <br />oper shall accommodate this pump station on its property. <br /> <br />The storm drain system located outside of the street right-of-way shall be private and <br />shall be maintained by the homeowner's association. There shall be an overland storm <br />drain release to the Arroyo Del Valle fi.om Court "B". The "V"-ditch located along the <br />back of the lots facing Court "B" shall be concrete and shall be connected to the overland <br />release. <br /> <br />The project developer shall provide a twelve-foot wide (12' 0") paved access to any <br />maintenance holes and/or storm drain inlet/outlet outside the street right-of-way that are <br />intended to be publicly maintained. This change shall be shown on the tentative subdivi- <br />sion map submitted for review and approval by the Planning Commission. <br /> <br />All roof leaders shall be connected to the street gutter unless otherwise approved by the <br />City Engineer. <br /> <br />The existing septic tank and leach field to the houses located on the Hahner and Costas <br />properties shall be abandoned per Alameda County Health Department regulations. <br /> <br />Unless used for landscape/vineyard irrigation, the existing wells located on the Costas <br />and Hahner properties shall be abandoned per Zone 7 standards. <br /> <br />Page-21- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.