Laserfiche WebLink
15. That the applicant shall complete hydroseeding of all <br /> cut/fill banks and disturbed areas upon completion of rough <br /> grading unless otherwise approved by the City Engineer. <br /> <br /> 16. That the applicant shall dedicate sufficient right-of-way <br /> along Vineyard Avenue to the satisfaction of the City Engi- <br /> neer to accommodate the ultimate 72' right-of-way. The <br /> applicant shall be responsible for completing the full <br /> improvements to the planned Vineyard Avenue from E1 Capitan <br /> Drive to Clara Lane, including, but not limited to, curbs, <br /> gutters, sidewalks, utilities, landscaping, striping, base <br /> sections and paving, and all transitions required by the City <br /> Engineer. The applicant shall be eligible for reimbursement <br /> through a reimbursement agreement for the costs of <br /> improvements constructed southerly of the planned centerline. <br /> In the event additional right-of-way is required on the south <br /> side of the road, the applicant shall bear the costs of <br /> acquisition; the City shall use its condemnation powers to <br /> acquire such land should the applicant be unable to secure <br /> it. <br /> <br /> 17. That the applicant be responsible for its pro-rata share of <br /> the costs for the northern and southern extensions of <br /> Bernal Avenue. <br /> <br /> 18. That the applicant provide vehicular access roadways to all <br /> sewer manholes to the satisfaction of the City Engineer. <br /> <br /> 19. That the applicant be responsible for undergrounding all of <br /> the existing overhead utility lines along the project's east, <br /> west and southern property lines, as directed by staff and <br /> PG&E. Included in these improvements shall be consolidation <br /> of the 12KV line onto the existing 60KV poles as deemed <br /> necessary by the City Engineer. The final utility plan shall <br /> be depicted on the tentative map for final review and approv- <br /> al. <br /> <br />20. That the applicant shall reconfigure the rear portions of <br /> Lots 16 and 17 in order to make available a minimum 25'-wide <br /> area of land for future use as an access point to the <br /> adjacent EBRPD property. The final design of this area shall <br /> be depicted on the tentative map. <br /> <br />21. That the developer be encouraged to work with PG&E so that <br /> interruption of electrical power will cause a minimum of <br /> interruption of power to the surrounding neighbors. Notice <br /> shall be provided to all adjacent neighbors prior to PG&E <br /> cutting off power for construction purposes. <br /> <br /> -3- <br />Ord. 1419 <br /> <br /> <br />