Laserfiche WebLink
II. <br /> <br />III. <br /> <br /> EXHIBT A <br />Additions to 0ri~inal Items <br />'~'. 1 Each Survey Monument <br />2. 1 Each 24" x 36" Splice Box <br />3. 50 Lin Ft 8" VCP <br />~x~lanation <br />1. Error in original Engineer's quantities. <br />2. Revision in PG6~ design. <br />3. Main lengthened for lot service. <br /> ADDED COST <br /> <br /> 50. O0 <br />110. O0 <br /> 3.05 <br /> <br /> S0.0( <br />110.0( <br />152.5( <br /> <br />$4,613.3~. <br /> <br />Reduction in Original Items (Amount shown is the reduction amount) <br />1. 14 each 17" x 30" Splice Boxes ~ 60.00 <br />2. 1 each 30" x 48" Splice Boxes ~ 300.00 <br />Explanation <br />1. and 2. Revision in PG&E design. <br /> <br />840.0( <br />300.0( <br /> <br />Total Deletion of Original Item <br />1. 79 Each Street Trees <br />2. 620 Lin Ft 3" Conduit w/1 ~0 Copper Neutral <br />3. 546 Lin Ft 3" Conduit w/250 MCM Copper Neutral <br />4. 278 Lin Ft 4" Steel pipe for primary conductor <br />Ex~lanation <br />1. Deleted by change order (See Schedule A). <br />2. thru 4. Revision in PC,&E design. ' <br /> REDUCED COSTS <br /> <br />15.00 <br /> 2.40 <br /> 3.00 <br /> 5.00 <br /> <br />1,185.0C <br />1,488.0C <br />1,638.0{ <br />1,390.0C <br /> <br />$6,841.0C <br /> <br /> ADDED COSTS: $4,613.39 <br /> REDUCED C(B'TS: 6~841.00 <br />SCHEDULE B ' TOTAL DECREASE IN COSTS : $2,227.61 <br /> <br />II. <br /> <br />III. <br /> <br />..S, CHEDULE C - TRACT 2~27 <br /> <br />Ngw Items <br /> 1. 25 Lin Ft <br />2. <br /> <br />4. 10 Each <br />5. 19 Each <br />6. 5 Each <br />7. 4 Each <br />8. 187 Lin Ft <br />9. 900 Lin Ft <br />10. 384 Lin Ft <br /> <br />11. 80 Each <br />Explanation <br /> <br />12" CMP w/flapgate <br />Construct reinforced concrete c~Vers <br />for 60'~42" electrical boxes Lump Sum <br />Relocate Fire Hydraut Lump Sum <br />Conc. foundations for std. steel pole ~ 80.00 <br />13"x24" Splice Box 6 45.00 <br />24'~36" Splice Box ~ 110.00 <br />36"x60" Splice Box @ 576.52 <br />2" Plastic Pipe (Cont. Encased) ~ 2.74 <br />2" Conduit w/1 ~4 neutral ~ 1.70 <br />4" Plastic Pipe for primary conductor, <br />concrete encased @ 4.50 <br />Street trees ~ 15.00 <br /> <br />1. Requested by City of Pleasanton. <br />2. Required by City of Pleasanton to replace std. metal covers. <br />3. Required by City of Pleasanton - existing water main prevented <br /> proper valving at std. location. <br />4. thru 10. Revision in PG6~ design. <br />11. Removed from "Streetwork", placed in incidental expenses. <br /> <br />Lump Sum <br /> <br />Additions to <br />1. 720 Lin <br />Explanation <br />1. Revision <br /> <br />original items <br />Ft 1~*' Conduit w/1 ~4 neutral <br /> <br />in PG&E design. <br /> <br />Reductions in <br />'1. 11 E~ch <br />Explanation <br />1. Revision <br /> <br /> ADDED COSTS= <br />Original Items <br /> Concrete foundations for heavy steel poles <br /> <br />in PG&E design. <br /> <br />2.00 <br /> <br />80.00 <br /> <br />$ 310.00 <br /> <br /> 749.O3 <br /> 460.00 <br /> 800.00 <br /> 855.00 <br /> 550.00 <br />2,30~.08 <br /> 512.38 <br /> 1,530.00 <br /> <br />1,728.00 <br />1,200.00 <br /> <br />1,440.00 <br /> <br />$12,440.49 <br /> 880.00 <br /> <br />EXHIBIT A <br /> <br /> <br />