Laserfiche WebLink
EXHIBIT A <br /> <br />II. <br /> <br />SCREDUI~ A o TRACT 2516 <br /> <br />1. 331.30 tons <br />2. 3 each <br /> <br />3. 145 Lin Ft <br /> 116 Lin Ft <br /> <br />4. 67 Each <br /> <br /> Explanation <br /> 1. Requested by City of Pleasanton. <br />2. <br />3. <br />4. <br /> <br />Cement Treated Base Hatarial @ 6.15 = <br />Concrete Foundations for heavy steel pole <br /> @ 131.08 = <br />Perforated pipe <br />Non perforated pipe Lump Sum <br />"V" Ditch <br />Street trees ~ 15.00 <br /> <br />Revision in PG~E design. <br />Requested by City of Pleasanton and soils en~ineers. <br />Removed from "Street Work" and placed in incidental expenses. <br /> <br />Additions to orisinal items <br /> <br />1.. 435 Lin Ft 6" Subdrain (Perforated Pipe) <br /> <br />@ 3.65 = <br /> <br />Explanation <br />1. Addit{on recommended by soils en~ineerl <br /> <br />ADDED COST: <br /> <br />2,037.50 <br /> <br /> 393.24 <br />1,165.15 <br />1,005.00 <br /> <br />1,587.75 <br /> <br />6,188.64 <br /> <br />III. <br /> <br />Reductions in original items <br />(~nount shorn is the reduction amount) <br /> <br />1. 2,057 Sq Ft <br />2. 1,051Sq Ft <br />3. 1,132 Sq Ft <br />4. 3 Each <br /> <br />7" Class II A~g. Base ~ 0.09 - 185.13 <br />7" A~S. Subbase ~ 0.075 = 78.82 <br />4" Agg. Subbase ~ 0.045 ' 50.94 <br />Concrete Foundation for std. pole ~ 68.50 = 205.50 <br /> <br />IV. <br /> <br />Explanatio.n . <br />l, 2, & 3 Due to addition of Cement Treated Rase Material. <br />4. Revision in PG&E design. <br /> <br />Tot.al Deletion ~ Original Items <br /> <br />1. 5,095 Sq Ft 5" Class II Ag~. Base <br />2. 67 Each Street Trees . <br /> <br />0.07 356.65 <br />15.00 1,005.00 <br /> <br />Explanation <br />1. Due t~"'addition of Cement Treated Base liaterial. <br />2. Deleted by Change Order from Const. Contract, placed under incidental expenses, <br /> funds transferred from District to City at Developer's request. <br /> REDUCED COSTS: 1,882.04 <br /> <br /> ADDED COSTS: 6,188.64 <br /> REDUCED COSTS: 1~882.04 <br /> <br />SCHEDULE B - TRACT 2517 <br /> <br />New Items · <br /> <br />1. 2 each Water valve "pot boxes" for sprinkler valves ~ 14.545 $ 29.09 <br />2. 12 each 13"x24" splice boxes ~ 45.00 ~0.00 <br /> <br />3. 882 Lin it 2" Conduit w/1 ~4 Bare Copper Neutral ~ 1.70 1,499.40 <br />4. 135 Lin Ft 2" Plastic Pipe (Cont. Encased) ¢ 2.74 369.90 <br />5. 115 Lin Ft 4" Plastic pipe for primary conduit ~ 4.50 517.50 <br /> <br />6. 2 Each Cont. Foundations for heavy steel poles @ 80.00 , 160.00 <br />7. 79 Each Street trees ~ 15.00 1,185.00 <br /> <br />Ex~lanatio~ <br />1. Requested by City of Pleasanton <br />2. thru 6. Revision in PC~ design. <br />7. Removed from "Streatwork", placed in incidental expenses, <br /> <br /> <br />