Laserfiche WebLink
EXHIBT A <br /> <br />IV. <br /> <br /> 80 Each <br />l. 116 Lin Ft <br />3, 23 Each <br />4. 603 Lin Ft <br />5. 566 Lin Ft <br />6. 550 Lin Ft <br />7. 274 Lin Ft <br />~xplanation <br /> <br /> Total Deletion of Original It~n <br /> Street Trees <br /> 10" VCP ~ 15.00 <br /> ~ 5.50 <br /> 17"x30" Splice Box <br /> ~ 60.00 <br /> 1~" Cdnduit w/1 ~2 neutral ~ 2.30 <br /> 3" Conduit w/1 ~0 neutral ~ 2.50 <br /> 3" Conduit w/250 HCM neutral @ 3,00 <br /> 4" Steel pipe for pr~-~ry conductor @ 5.00 <br />1. Deleted by Change Order (Sea Schedule A). <br />2. Installed by others. <br />3. thru 7. levlston in ~ design. <br /> <br /> . REDUCED <br /> <br />1,200.0 <br /> 638.0 <br />1,380.0 <br />1,386.9I <br />1,415.01 <br />1,650.0( <br />1,370.0( <br /> <br />$9,919.9C <br /> <br />ADDED COSTS: <br />REDUCED COSTS: <br /> <br />SCHEDULE C - TOTAL INCREASE IN COSTS: <br /> <br />$12,440.4 <br /> 9~919.~ <br /> <br />$ 2,520.5 <br /> <br />SCHEDCTL~ A - Cost increase! <br />SCHEDULE B - Cost decrease: <br />SCHEDULE C - Cost increase: <br /> <br /> TOTAL PROJECT COST INCREASE~ <br /> <br />$ 4,306.60 <br /> 2,227.61 <br /> 2,520.59 <br /> <br />$ 4,599.58 <br /> <br />SUMMARy OF CONTINGENCY FUND <br /> <br /> 1o Original Amount = <br /> <br />2. Project Cost Increase = <br /> <br />3. Sewage Plant Plus <br /> Landscaping Funds = <br /> <br /> BALANCE OF CONTINGENCIES <br /> <br />4,599°58 <br /> <br />,,13a000.O0 <br /> 208.76 <br /> <br />EXHIBIT A <br /> <br /> <br />