Laserfiche WebLink
12. The applicant shall submit a sample of the enhanced paving <br /> to be utilized in the circular drive to the Planning <br /> Director for review and approval prior to the issuance of a <br /> building permit. <br /> <br />13. The owner of Lot 1 shall be responsible for the maintenance <br /> of the landscaped area on the Sunol Boulevard side of the <br /> soundwall. The responsibility for the maintenance of this <br /> area by the owner of Lot 1 shall be included in the project <br /> CC&Rs. The developer shall install the water meter for the <br /> irrigation lines for this landscape area prior to the <br /> occupancy of the first residence on the project site. <br /> <br />14. The applicant shall construct the cul-de-sac and portion of <br /> the driveway for Lot i (shown as cross-hatched), sufficient <br /> to meet the requirements of a Fire Department turnaround, <br /> prior to the occupancy of the first residence to be located <br /> on the site. Prior to the issuance of building permits for <br /> the structure on Lot 1, the developer shall pave a portion <br /> of the driveway leading to Lot 3 which will replace the <br /> portion of the driveway on Lot 1 as the Fire Department <br /> turnaround. These respective driveways must be kept free <br /> and clear at all times while they are designated the <br /> required turnaround- <br /> <br /> 15.- The portion of the soundwall shown as 8' in height shall be <br /> increased to 9' in height, if necessary, in order that the <br /> minimum elevation of the top of the soundwall is 383 ft. <br /> <br /> 16. The developer shall pay the cost of 20 linear feet of 6' <br /> high flintstone veneer soundwall to be used toward the <br /> future construction of a soundwall along the Sunol Boulevard <br /> frontage of the adjacent property owner, Mr. Teixeira, per a <br /> prior agreement with the City and Ted Mavridis. <br /> <br /> 17. The applicant shall pay a pro-rata share of the cost of the <br /> street and frontage improvements constructed along Sunol <br /> Boulevard per a prior reimbursement agreement between the <br /> City and Ted Mavridis. <br /> <br /> 18. The developer shall modify the grades of the cul-de-sac to <br /> provide a drainage system satisfactory to the City Engineer. <br /> <br /> 19. The developer shall create a homeowner's association in the <br /> project CC&R's which shall be responsible for maintaining <br /> the circular entrance drive. The City shall be granted the <br /> rights and remedies of the association, but not the <br /> obligation, to enforce the maintenance obligation. The City <br /> Attorney shall review and approve the proposed CC&R's prior <br /> to the recordation of the final map. <br /> 20. The developer shall grant cross drainage, access, and 16 <br /> <br /> <br />