My WebLink
|
Help
|
About
|
Sign Out
ORD 1509
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:37:50 AM
Creation date
3/11/1999 5:38:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1509
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development of the project site, the preservation <br /> of all possible heritage trees, and minimization of <br /> project impacts on other vegetative and wildlife <br /> resources has been or will be provided for and the <br /> impact has been reduced to an insignificant level. <br /> <br />F. Public Services/Fiscal Impacts <br /> Impacts: <br /> <br /> 1. The City finds that approval of the 149 unit <br /> development plan as initially proposed could <br /> increase wildfire hazard due to potentially <br /> inadequate project wild land management (Final EIR, <br /> page 7-2). <br /> <br /> 2. The City finds that approval of the 149 unit <br /> development plan as initially proposed would have a <br /> significant impact on the City's fire protection <br /> systems due to excessive length of the "D" and "E" <br /> cul-de-sacs, in the absence of a "Moderate Fire <br /> Hazard" rating for project open space (Final EIR, <br /> page 7-2). <br /> <br /> 3. The City finds that approval of the 149 unit <br /> development plan as initially proposed could result <br /> in inadequate water pressure during a fire <br /> emergency for proposed homes on "D" and "E" Courts, <br /> due their elevation. This is a potential <br /> significant impact (Final EIR, page 7-5). <br /> <br /> 4. The City finds that the McLeod Pump Station has <br /> inadequate pumping capacity to meet increased water <br /> .demand caused by recent and planned development in <br /> the area, including the project (Final EIR, page 7- <br /> 5). <br /> <br /> 5. The City finds that lack of water distribution <br /> pipeline connections between Windmill Lane and the <br /> project boundary is a significant impact (Final <br /> EIR, page 7-5). <br /> <br /> Facts: <br /> <br /> 1. The project developer is required to pay a pro-rata <br /> share of the costs to upgrade the McLeod Pump <br /> Station. <br /> <br /> 2. The project developer shall contribute funds <br /> towards the acquisition of one wildland fire- <br /> fighting vehicle for the Fire Department, and one <br /> <br /> - 15 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.