My WebLink
|
Help
|
About
|
Sign Out
ORD 1565
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1565
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:49:34 AM
Creation date
3/10/1999 7:11:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1565
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27. Mitiaation Measure 8-112 Fill Standards for Subdivision <br /> eradin~ <br /> <br /> What: Provide recommendations and plans for subdivision <br /> grading which will minimize differential settlement <br /> Who: Developer and his engineering consultants <br /> When: Prior to tentative map approval <br /> Timing: Prior to issuance of grading permit <br /> Who Verifies: Pleasanton Public Works Department <br /> <br />28. Mitigation Measure 8-12: Subdivision Gradin~ Performance and <br /> Inspection <br /> <br /> What: Perform approved subdivision grading work <br /> Who: Developer and his engineering consultants and <br /> contractors <br /> When: After approval of subdivision grading permit <br /> Timing: Prior to issuance of building permits <br /> Who Verifies: Pleasanton Public Works Department <br /> <br />29. M~tiqation Measures 8-13 and 8-14~ Expansive Soil Evaluation <br /> and Drainage Provisions <br /> <br /> What: Provide recommendations and plans for lot grading and <br /> foundation construction which will minimize the impacts of <br /> soil expansion <br /> Who: Developer and his engineering consultants <br /> When: Prior to buildin~ permit approval <br /> Timing: Prior to issuance of occupancy permit <br /> Who Verifies: Pleasanton Public Works Department <br /> <br />30. Mitiqation Measure 8-15~ Expansive Soil - Foundation <br /> C~nstruction P~ocedureS <br /> <br /> What: Perform approved foundation construction and lot <br /> grading work <br /> Who: Developer and his engineering consultants and <br /> contractors <br /> When: After approval of building permits <br /> Timing: Prior to issuance of occupancy permit <br /> Who Verifies: Pleasanton Public Works Department <br /> <br />31, Miti~ation Measure 8-16: Earthquake Resistant Design and <br /> Construction <br /> <br /> What: Provide recommendations and plans designed to minimize <br /> building damage caused by earthquakes <br /> Who: Developer and his engineering consultants <br /> When: Prior to buildin~ permit approval <br /> Timing: Prior to issuance of occupancy permit <br /> Who Verifies: Pleasanton Public Works Department <br /> <br /> 39 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.