My WebLink
|
Help
|
About
|
Sign Out
ORD 1565
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1565
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:49:34 AM
Creation date
3/10/1999 7:11:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1565
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22. Mitigation Measures 8.-2 throuqh 8-6= Slope Stability - <br /> Stabilization Proqram <br /> <br /> What: Evaluate and provide specific design recommendations to <br /> stabilize unstable and potentially unstable slopes <br /> Who: Developer and his engineering consultants <br /> When: Prior to tentative map approval <br /> Timing: Prior to tentative map approval (8-2); prior to <br /> grading permit approval (8-3 through 8-6) <br /> Who Verifies: Pleasanton Public Works Department after <br /> geotechnical peer review <br /> <br />23. Mitiqation Measure 8-7= Slope 8tability - Grading Procedures <br /> <br /> What: Perform slope stabilization grading as recommended by <br /> developer's geotechnical and civil engineers slopes <br /> Who: Developer and 'his engineering consultants and <br /> contractors <br /> When: After approval of subdivision grading permit <br /> Timing: Prior to issuance of building permits <br /> Who Verifies: Pleasanton Public Works Department <br /> <br />24. Mitiqation Measure 8-8: Erosion Control Plans <br /> <br /> What: Provide recommendations and plans for preventing <br /> erosion <br /> Who: Developer and his engineering consultants <br /> When: Prior to tentative map approval <br /> Timing: Prior to issuance of building permits <br /> Who Verifies: Pleasanton Public Works Department <br /> <br />25. Mitiqation Measure 8-9= Construction 'of Erosion Control <br /> Measures <br /> <br /> What: Perform approved erosion control work <br /> Who: Developer and his engineering consultants and <br /> contractors <br /> When: After approval of subdivision grading permit <br /> Timing: Prior to issuance of occupancy permits <br /> Who Verifies: Pleasanton Public Works Department <br /> <br />26. Mitiqation Measure 8-10= Surface Erosion Control <br /> <br /> What: Planting and hydroseeding <br /> Who: Developer and his contractors <br /> When: After subdivision grading permit issued <br /> Timing: Prior to issuance of occupancy permits <br /> Who Verifies: Pleasanton Public Works Department <br /> <br /> 38 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.