My WebLink
|
Help
|
About
|
Sign Out
ORD 1565
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1565
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:49:34 AM
Creation date
3/10/1999 7:11:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1565
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32. Mitiqation Measure 8-17: Implement Hydraulic Improvement~ <br /> <br /> What: Implement the hydraulic improvements shown on the <br /> Drainage Plan <br /> Who: Developer and his engineering consultants and <br /> contractors <br /> When: After approval of subdivision grading permit <br /> Timing: Prior to issuance of building permits <br /> Who Verifies: Pleasanton Public Works Department <br /> <br />33. Miti~ation Measure 8-18: Revise Gradinq Pla- <br /> <br /> What: Provide on-site earthwork balance, or reduce off-haul <br /> and limit hauling to a nearby site <br /> Who: Developer and his engineering consultants <br /> When: Prior to tentative map approval <br /> Timing: Prior to grading plan approval <br /> Who Verifies: Pleasanton Public Works Department <br /> <br />34. M~tiqation Measure 8-19A: Drainage of Sprin~s, Streams an~ <br /> Fills <br /> <br /> What: Provide recommendations for controlling drainage from <br /> springs or streams, especially for all springs or streams <br /> which will be covered by fill. <br /> Who: Developer and his engineering consultants <br /> When: Prior to buildin~ permit approval <br /> Timing: Prior to issuance of occupancy permit <br /> Who Verifies: Pleasanton Public Works Department <br /> <br />35. Miti~ation Measure 8-198: Groundwater - Drainage of Slopes <br /> <br /> What: Evaluate the necessity for drainage of cut slopes <br /> Who: Developer and his geotechnical engineering consultant <br /> When: Prior to tentative map approval <br /> Timing: Prior to issuance of grading permit <br /> Who Verifies: Pleasanton Public Works Department <br /> <br />36. Mitiqation Measure 8-2o: Groundwater - Relation to Surfac~ <br /> Drainaqe <br /> <br /> What: Evaluate the surface drainage system for the <br /> development as a whole to determine the effects of the surface <br /> drainage system on the ~roundwater regime at the site <br /> Who:Developer and his geotechnical engineering consultant <br /> When: Prior to tentative map approval <br /> Timing: Prior to issuance of grading permit <br /> Who Verifies: Pleasanton Public Works Department <br /> <br /> 40 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.