My WebLink
|
Help
|
About
|
Sign Out
ORD 1565
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1565
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:49:34 AM
Creation date
3/10/1999 7:11:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1565
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Mitigation Measures'of the EIR <br /> <br />The EIR identified the following mitigation measure which would <br />substantially avoid this construction noise impact. <br /> <br />9-3 Minimize construction noise (Draft EIR, page 9-6). Said <br /> mitigation measure was considered and adopted with any <br /> pertinent changes in Condition 9-3, Exhibit "B" of the City <br /> Council staff report dated June 16, 1992. <br /> <br />Finding: Mitigation Measure 9-3 Feasible and Required <br /> <br />The City finds that it is feasible to mitigate this impact to a <br />less-than-significant level by requiring the applicant and <br />successors in interest to incorporate the specific provisions of <br />Mitigation 9-3 into the project design. The applicant and <br />successors in interest shall incorporate such construction noise <br />impact reduction provisions into project design as a "Condition of <br />Approval" to the project. <br /> <br /> 23 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.