Laserfiche WebLink
Sanitation: Sewage Collection <br /> <br /> Impact: Potential problem in downstream sewer collection capacity <br /> <br /> The City finds that the existing sewer pump station in the adjacent <br /> Carriage Gardens subdivision may be inadequate to handle the <br /> additional effluent loading by the project. This is a potential <br /> significant impact (Draft EIR, page 7-6). <br /> <br /> Proposed Mitigation Measure of the EIR <br /> <br /> The EIR identified the following mitigation measure which would <br /> substantially avoid this impact. <br /> <br /> 7-7 Ensure adequate sewer collection capacity (Draft EIR, page <br /> 7-7). Said mitigation measure was considered and adopted with <br /> any pertinent changes in Condition 7-6, Exhibit "B" of the <br /> City Council staff report dated June 16, 1992. <br /> <br /> Finding: Mitigation Measure 7-7 Feasible and Required <br /> <br /> The City finds that it is feasible to mitigate this impact [o a <br /> less-than-significant level by requiring the applicant and <br /> successors in interest to install a new pump facility to serve the <br /> project and contribute an equitable share'to the cost of any long- <br /> term pump capacity upgrade. <br /> <br />2.6 Geology, Soils, Grading and Drainage <br /> Unstable Slopes, Landslides and Slope Creep <br /> <br /> Impact: Structural damage by future slope movement <br /> <br /> The City finds that project structures could be damaged by future <br /> slope movement where structures are constructed on or near existing <br /> land slide deposits. This is a potential significant impact (Draft <br /> EIR, page 8-11). <br /> <br /> Proposed Mitigation Measures of the EIR <br /> <br /> The EIR identified the following mitigation measures which would <br /> substantially avoid this geotechnical impact. <br /> <br /> 8-1 Conduct slope stability analyses (Draft EIR, page 8-11). Said <br /> mitigation measure was considered and adopted with any <br /> pertinent changesin Condition 8-1, Exhibit "B" of the City <br /> Council staff report dated June 16, 1992. <br /> <br /> 8-2 Provide detailed slope stabilization program (Draft EIR, page <br /> 8-11). Said mitigation measure was considered and adopted <br /> with any pertinent changes in Condition 8-2, Exhibit "B" of <br /> the City Council staff report dated June 16, 1992. <br /> <br /> 16 <br /> <br /> <br />