Laserfiche WebLink
8-3 Provide detailed construction plan for landslide stabilization <br /> (Draft EIR, pages 8-11 ad 8-12). Said mitigation measure was <br /> considered and adopted with any pertinent changes in Condition <br /> 8-3, Exhibit "B" of the City Council staff report dated June <br /> 16, 1992. <br /> <br /> 8-4 Control subdivision surface drainage (Draft EIR, page 8-12). <br /> Said mitigation measure was considered and adopted with any <br /> pertinent changes in Condition 8-4, Exhibit "B" of the City <br /> Council staff report dated June 16, 1992. <br /> <br /> 8-5 Reduce damage to structures from slope creep (Draft EIR, page <br /> 8-12). Said mitigation measure was considered and adopted <br /> with any pertinent changes in Condition 8-5, Exhibit "B" of <br /> the City Council staf~ report dated June 16, 1992. <br /> <br /> 8-6 Implement grading procedures for slope stabilization (Draft <br /> EIR, page 8-12). Said mitigation measure was considered and <br /> adopted with any pertinent changes in Condition 8-6, Exhibit <br /> "B" of the City Council staff report dated June 16, 1992. <br /> <br /> Finding: Mitigation Measures 8-1 through 8-6 Feasible and Required <br /> <br /> The City finds that'it is feasible to mitigate this impact to a <br /> less-than-significant level by requiring the applicant and <br /> successors in interest to incorporate the specific provisions of <br /> Mitigations 8-1 through 8-6 into the project design. The applicant <br /> and successors in interest shall incorporate such geotechnical <br /> impact reduction provisions into project design as a "C6ndition of <br /> Approval" to the project. <br /> <br />Stream, Gully and Sheet Erosion <br /> <br /> Impact: Potential for stream, qully and sheet erosion <br /> <br /> The City finds that the project could experience stream, gully and <br /> sheet erosion which can cause landslides and sedimentation build-up <br /> in creeks and other drainageways. This is a potential significant <br /> impact (Draft EIR, page 8-13). <br /> <br /> Proposed Mitigation Measures of the EIR <br /> <br /> The EIR identified the following mitigation measures which would <br /> substantially avoid this erosion impact. <br /> <br /> 8-8 Prepare erosion control plans (Draft EIR, page 8-13). Said <br /> mitigation measure was considered and adopted with any <br /> pertinent changes in Condition 8-8, Exhibit "B" of the City <br /> Council staff report dated June 16, 1992. <br /> <br /> 17 <br /> <br /> <br />