My WebLink
|
Help
|
About
|
Sign Out
ORD 1565
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1565
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:49:34 AM
Creation date
3/10/1999 7:11:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1565
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5 Public Facilities and Services <br /> <br />Police Protection <br /> <br /> Impact: Police protection in open space area <br /> <br /> The City finds that the project in general will increase police <br /> protection demand and specifically could result in police <br /> protection problems in the open space corridor along Happy Valley <br /> Creek. This is a potential significant impact (Draft EIR, page <br /> <br /> Proposed Mitigation Measures of the EIR <br /> <br /> The EIR identified the following mitigation measures which would <br /> substantially avoid this police protection impact. <br /> <br /> 7-1 Add police protection services (Draft EIR, page 7-1). This <br /> would occur under the City's normal budgetary/personnel <br /> process, thus, no mitigation required. <br /> <br /> 7-2 Establish Homeowners Association/Police Department liaison <br /> (Draft EIR, page 7-2). Through a "Neighborhood Watch" <br /> program, this requirement will be adequately fulfilled. Said <br /> mitigation measures were considered and adopted with any <br /> pertinent changes in Condition 7-1, Exhibit "B" of the City <br /> Council staff report dated June 16, 1992. <br /> <br /> Finding: Mitigation Measure 7-2 Feasible and Required <br /> <br /> The City finds that it is feasible to mitigate this impact to a <br /> less-than-significant level by requiring the applicant and <br /> successors in interest to incorporate the specific provisions of <br /> Mitigation 7-2, as discussed above, into the project design. The <br /> applicant and successors in interest shall incorporate such police <br /> protection impact reduction provisions into project design as a <br /> "Condition of Approval" to the project. <br /> <br />Fire Protection <br /> <br /> Impact: Potential wildfire danger to project residences <br /> <br /> The City finds that project residences could experience wildfire <br /> hazard from existing off-site open space along the 1-680 project <br /> frontage and from the open space corridor along Happy Valley Creek. <br /> This is a significant impact (Draft EIR, pages 7-2 and 7-3). <br /> <br /> Proposed Mitigation Measures of the EIR <br /> <br /> The EIR identified the following mitigation measure which would <br /> substantially avoid this fire protection impact. <br /> <br /> 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.