Laserfiche WebLink
CULTURAL RESOURCES <br /> <br />IMPACT 10A: Although no significant archeological resources are known on-site, there is a <br />potential that future earthmoving activities could uncover archaeological materials. FEIR page <br />10-2. <br /> <br /> Mitigation. Measure 10-1: Follow stop-work and notification procedures if cultural <br /> resources are found during construction. FEIR page 10-2. <br /> <br /> 511gliag: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> Rationale for Finding: If archeological resources are found, they will be handled punuant <br /> to the stop-work and notification procedures of the FIR. This will minimize any potential <br /> impacts. <br /> <br />CUMULATIVE TRAFFIC IMPACTS <br /> <br />IMPACTS 13.2A and 13.2B: General Plan buildout will result in congested intersections and <br />freeway bottlenecPa in Pleasamon. FEIR page 13-2. <br /> <br /> Mitigation Measure 13.2-1: Follow mitigations of the EIR for the Pleasanton General <br /> Plan, including transportation management standards, u~ of the Downtown Specific Plan <br /> to improve levels of service, and other measures. Require the project to pay its pro-ram <br /> share of planned street improvements to Bernal Avenue. <br /> <br /> EiagLi/lg: Changes or alterations have been required in, or incorporated into the project that <br /> avoid or substantially lessen the significant effect identified in the Final EIR. However, <br /> ~ impact would not be reduced to an insignificant level. A Statement of Overriding <br /> Considerations must be adopted upon approval of the project. <br /> <br /> gationale for Finding: Proposed measures would improve traffic conditions by redm.-'ing <br /> trips and fa~:ilitating traffic flow. However. impacts cannot be fully mitigated. Thes~ <br /> impacts would occur with or without the Kottinger Hills Project. <br /> <br />CUMULA77VE IMPACT: WATER SUPPLY <br /> <br />IMPACT 13.3A: Ongoing urban development in the area is resulting in a cumulative increase in <br />water demand. FE1R pages 134, 13-5. <br /> <br /> Mitigation Measure 13.3-1: The City shall support and coordinate with areawide efforts <br /> by other agencies to address cumulative impacts on water supplies. FEIR page 13.3-1. <br /> <br /> Eias;liag: Such areawide efforts are within the primary responsibility and jurisdiction of <br /> another public agency and not the City of Pleasantc~. Such actions can and should be <br /> <br /> 17 <br /> <br /> <br />