My WebLink
|
Help
|
About
|
Sign Out
ORD 1579
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:57:53 AM
Creation date
3/10/1999 6:50:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1579
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Miti_~atiorf Measures 9-1.9-23 and 9-24: Provide a detailed drainage plan and ranoff <br /> calculations. Design drainage plan to prevent any increase in offsite peak flows. F~'rR <br /> page 9-19. <br /> <br /> ~: Changes or alterations have been requirext in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> Rationale for Finding: The requirement for no net incr~a.~ in ranoff will avoid porehie <br /> offsite flooding and drainage impacts, sinc~ no additional water will leave the sit~during <br /> peak hours. <br /> <br />IMPACT 9H: Any irabalance in cut and fill could cream excessive truck traffic to haul dirt <br />offsite. <br /> <br /> Mi~i_~afion Measure 9-25: Require balance of cut and fill, or reduce any offsite hauling to <br /> a nominal level. <br /> <br /> Eil]aillg: Changes or alterations have been required in, or incorporated into the project that <br /> avoid or Substantially lessen the' significant effect identified in the EIR. <br /> <br /> Rationale for Finding. The requirement for balanced cut and fill will minimize the <br /> potential need for offsite hauling. <br /> <br />GROUND WATER <br /> <br />IMPACT 9I: Shallow groundwater may be present on the site. Grading could affect groundwater <br />flow. Landscape irrigation could adversely affect groundwater. FEIR pages 9-20, 9-21. <br /> <br /> Mitigation Measures 9-1.9-26 through 9-29: Identify all areas exhibiting shallow ground' <br /> wate~ conditions, and recommend actions for shallow groundwater effects. Evaluate <br /> surface drainage in relation to groundwater. Subdrains shall be installed according to the <br /> standards in the FEIR. Irrigation guidelines shall be provided to project homeowners. <br /> FEIR page 9-21. <br /> <br /> ~: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> Rationale for Finding: The geotechnieal investigation will identify potential ground water <br /> problems, and development will proceed only in accordance with strict standards. <br /> Necessary suMrains will be installed and imgation guidelines will be given to project <br /> residents to ensure that irrigation will not adversely affect ground water. <br /> <br /> 16 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.