My WebLink
|
Help
|
About
|
Sign Out
ORD 1579
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:57:53 AM
Creation date
3/10/1999 6:50:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1579
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISTIJ'RBANCE OF RAPTOR NF_~TS <br /> <br />IMPACT 6D: Rapton are birds of special interest, under provisions of the Migratory Bird Treaty <br />Act. Construction disturbance which would lead to raptor nest abandonment would constitute an <br />adverse effect of the project. FEIR page 6-17. <br /> <br /> Miti~,ation Measure 6-4: Avoid construction activities which would result in disturbanc~ <br /> to active raptor nests. FEIR page 6-22· <br /> <br /> Finding: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> Rationale for Finding: The mitigation measur~ in the gIR would plac~ appropriate <br /> restrictions on construction activities near active raptor n~ta, thus avoiding this impact. <br /> <br />DQMF_~C WATER SUPPLY <br /> <br />IMPACT 7.1B: The proposed storage reservoir will not meet the storage requirement for water <br />in this area. FEIR page 7-5. <br /> <br /> Mitigation Measure 7.1-2: The developer shall construct the reservoir to provide adequate <br /> storage. FEIR page 7-7. <br /> <br /> ELMiIIg: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> Rationale for Finding: The requirement for an adequate size of reservoir would assure <br /> that adequate water storage would be available in this area. <br /> <br />RESERVOIR ELEVATION <br /> <br />IMPACT 7.1C: The elevation of the proposed reservoir may result in inadequate water pressure <br />for some homes. FI~IR page 7-5. <br /> <br /> Mitigation Measure 7- I. 3: Place restrictions on homes which could have inadequate water <br /> pressure. FI::JR page 7-7. <br /> <br /> ~: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> R~tionale for Finding: Restriction on home elevations will be effective in eliminating <br /> concerns due to inadequate water pressure, which is directly related to elevation. <br /> <br /> 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.