My WebLink
|
Help
|
About
|
Sign Out
ORD 1579
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:57:53 AM
Creation date
3/10/1999 6:50:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1579
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMPING <br /> <br /> IMPACT 7.1D: The proposed project could adversely affect pumping facilities, including the <br /> Kottinger Hills Pump Station and the Grey Eagle Pump Station. Additional pump capacity is <br /> needed to serve the new development. FEIR pages 7-5, 7-6. <br /> <br /> Mitigation Measure 7.1-4: Provide additional pump capacity and modify existing pump <br /> stations. FEIR page 7-7. <br /> <br /> Ei!liallg: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> ]~afionale for Finding: The modifications required by the mitigation measure will resolve <br /> the lack of pump capacity. <br /> <br />PIPING <br /> <br />IMPACT 7.1E. Water piping may have capacity constrmnts. FEIR page 7-6. <br /> <br /> Mitigation Measure 7.1-~: Perform a hydraulic analysis and modify. piping as ne~le~d. <br /> ~ page 7-7. <br /> <br /> ~: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> Rationale for Finding: The piping modifications required by this mitigation measure <br /> would allow for additional water capacity as needed to serve the new development. <br /> <br />CONSTRUCTION DISRUPTION <br /> <br />IMPACT 7.1F: In order to install needed pipe and make pump modifications, the existing streets <br />in the Grey Eagle subdivision would be disrupted by construction activity. FEIR page 7-6. <br /> <br /> Mitigation Measure 7.1-~: Phase construction to minimize disruption of existing stn~ts. <br /> Work as quickly as possible. FEIR page 7-8. <br /> <br /> ~: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> Rationale for Finding,: The requirement for phasing will minimize construction disruption <br /> in this area. <br /> <br /> tO <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.