My WebLink
|
Help
|
About
|
Sign Out
ORD 1579
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1501 - 1600
>
ORD 1579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 11:57:53 AM
Creation date
3/10/1999 6:50:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1579
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigatiori Measure 6-1: Complete a detailed tree survey, require tree replacement, and <br /> apply tree protection measures for trees to remain. FEIR pages 6-19, 6-20. <br /> <br /> Finding: Changes or alterations have been required in, or incorporated into the project. <br /> However, the changes or alterations required in or incorporated into the project would not <br /> reduce this impact to a level of insignificance. Therefore, a Statement of Overriding <br /> Considerations must be adopteel upon approval of the project. <br /> <br /> Rationale of Finding: The provision of standards to protect retained woodland, and the <br /> requirement of tree replacement, will lessen impacts on oak woodland. However, due to <br /> the large scale of destruction of oak woodland (an estimated 3,300 to 4,700 trees), this <br /> impact cannot be mitigated to a level of insignificance through the application of mitigation <br /> measure,s, without altering the basic character of the project. Alternatives to the project <br /> are available to reduce this impact to a level of insignificance, as discussed in Section 2 <br /> of this document. <br /> <br />AQUATIC HABITAT <br /> <br />IMPACT 6B: The filling of existing drainage channels and stock ponds will have an adverse <br />effect on aquatic habitat. FEIR page 6-9, 6-10. <br /> <br /> Miti!_~ation Measure 6-2: Develop and implement a channel restoration plan or the creation <br /> of out-of-kind wetlands to replace channel habitat to be lost. FEIR page 6-21. <br /> <br /> Finding: Changes or alterations have been required in, or incorporated into the project that <br /> would avoid or substantially lessen the significant effect identified in the FEIR. <br /> <br /> Rationale of Finding: The restoration of aquatic habitat would compensate for the loss of <br /> this habitat on the site due to construction. The habitat would be replaced on an equal or <br /> greater basis. <br /> <br />WATER OUAL1TY DEGRADATION <br /> <br />IMPACT 6C: The project would result in decline in water quality downstream of the project, due <br />to sedimentation, runoff pollutants, and golf course maintenance. FEIR page 6-17. <br /> <br /> Miti_tPation Measure 6-3: Develop and implement an erosion control plan and site <br /> management plan which will provide for the protection of downstream aquatic habitat. <br /> FEIR page 6-22. <br /> <br /> EitaiIlg: Changes or alterations have been required in, or incorporated into the project <br /> that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br /> Rationale for Finding: By controlling erosion and runoffpollutants, these potential effects <br /> of the pwject can be reduced to an insignificant level. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.