My WebLink
|
Help
|
About
|
Sign Out
ORD 1648
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1601 - 1700
>
ORD 1648
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2003 12:55:52 PM
Creation date
3/9/1999 7:09:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1648
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24. The developer shall make a good faith effort in obtaining all necessary approvals <br /> (including but not limited to Zone 7, the Army Corps of Engineers, and the Department of <br /> Fish & Game) to construct the low-flow crossing and creek trail. <br /> <br />25. The applicant shall provide a cash bond to the City guaranteeing the installation of the <br /> low-flow creek crossing and creek trial. The applicant shall provide an itemized cost <br /> estimate of said improvements, to be submitted with the cash bond, for the review and <br /> approval of the Planning Director prior to issuance of the first building permits. The cash <br /> bond shall be returned to the applicant upon completion and acceptance of said <br /> improvements by the Planning Director. In the event that the applicant fails to obtain the <br /> required approvals, the City may use this money to construct said improvements or <br /> construct other public amenities, as the City deems appropriate, to provide the <br /> compensation for the project's increased density over the General Plan's holding capacity <br /> as determined for the site. <br /> <br />26. Prior to occupancy of Lot #16 and #15 or occupancy of fifty. one (51) percent of the units, <br /> which ever occurs first, the mini-park improvements shall be completed and shall be <br /> subject to acceptance by the Planning Director as complete. <br /> <br /> 27. The applicant shall record CC&R's at the time of recordation of the final map which shall <br /> create a property owners association for the development. The CC&R's shall be subject to <br /> the review and approval of the City Attorney prior to recordation of the final map. The <br /> property owners association shall be responsible for the maintenance of all common areas <br /> and facilities on the site, including the low-flow crossing, creek trail, and mini-park area. <br /> The City shall be granted the rights and remedies of the association, but not the obligation, <br /> to enforce the maintenance responsibilities of the property owners association. <br /> <br /> 28. Prior to final map approval, a detailed maintenance plan and schedule for the common <br /> open space improvements shall be submitted to the Planning Director for review and <br /> approval. The maintenance plan shall specifically include the requirements to annually <br /> monitor the eastern and western creek bank for degradation during winter storms. This <br /> plan shall include any permit requirements from the Department of Fish & Game. In <br /> addition, the maintenance plan shall include an emergency repair action plan to address <br /> emergency repair operations, which may include but is not limited to the formation of a <br /> Geologic Hazard Abatement District. This maintenance plan and schedule shall be <br /> included as pan of the CC&R's for the project. <br /> <br /> 29. A public access and use easement shall be placed over the arroyo slope bank and creek <br /> areas and over an access corridor across the mini-park connecting the public street to the <br /> top of the creek bank. A creek/public trail shall be located in the access corridor. The <br /> details of this easement shall be shown on the final map and shall be subject to the review <br /> and approval of the City Engineer and the Planning Director. The City shall assume <br /> liability for the public's use of these areas in a manner consistent with other public trails <br /> and arroyos, subject to the City Attorney's approval. <br /> <br /> PUD-94-04 City Council Conditions Of Approval - Page 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.