My WebLink
|
Help
|
About
|
Sign Out
ORD 1735
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1701 - 1800
>
ORD 1735
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:23 PM
Creation date
3/8/1999 6:37:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1735
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) Lots I and 2 shall be connected to the sanitary. sewer and water lines. electrical <br /> and gas lines located in Trenery Drive. Storm water from Lots I and 2 may <br /> drain onto the remaining, Lauer property if allowed by the City Engineer and <br /> the Lauers or subsequent owner of Lot 4. <br /> <br /> 2) The owner/developer shall record an easement for the storm drainage line <br /> crossing Lot 2 from Lot I with the first parcel map. <br /> <br /> b. Second Phase (Lots 3 through 6): <br /> <br /> 1) All storm lines serving Lots I through 6 and sanitary sewer lines serving Lots <br /> 3 through 6 shall be extended to the utility "stubs" from Dennis Drive located <br /> on the west side of Lot 5. The storm and sanitary lines for Lots 5 and 6, how- <br /> ever, may be installed at the time these lots develop. <br /> <br /> 2) All utilities shall be located in private easements and shall be privately main- <br /> tained. The owner/developer shall create, with recordation of the final parcel <br /> map, reciprocal utility easements with maintenance and repair responsibilities <br /> clearly defined among all future parcels. This condition shall also apply to <br /> Lots I and 2. <br /> <br /> 3) The owner/developer, with recordation of the final parcel map, shall create re- <br /> ciprocal access easements and shared maintenance responsibilities for the joint- <br /> access driveway serving Lots 3 through 6. <br /> <br /> 4) The owner/developer shall widen Martin Avenue to twenty-eight feet (28' 0") <br /> along the frontage of Lots 2, 3, and 6, to allow for two travel lanes. one parking <br /> lane, and a rolled-curb and gutters located on the west side of the street. The <br /> alignment of Martin Avenue shall be designed so as to provide adequate clear- <br /> ante of the existing trees facing Lots 2, 3, and 6 to the satisfaction of the Plan- <br /> ning Director and City Engineer. The Manin Avenue structural-section shall <br /> be analyzed to determine if it is to be reconstructed in its entirety or resuffaced. <br /> subject to the approval of the City Engineer. <br /> <br /> 5) The owner/developer shall construct a water line in Manin Avenue from the <br /> Trenery Drive intersection with Manin Avenue to a location concurrent with <br /> the northernmost boundary line of Lot 6. At this time. water lines shall also be <br /> extended to Lots 3 through 6. <br /> <br /> 6) The Lauers or subsequent owners (Lot 4) may continue to use the existing well <br /> serving this lot after recordation of the parcel map. After connection to City <br /> water, the well may be retained but used only to water domestic landscaping. <br /> A reduced-pressure, backflow device shall be used to isolate City water and <br /> domestic well lines. The Lauers or subsequent owners shall obtain all neces- <br /> <br />P UD-9 7-16 (Lauerl Exhibit "B; Final Conditions of,4pproval Page 2 of 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.