My WebLink
|
Help
|
About
|
Sign Out
PC 99-04
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1999
>
PC 99-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:51 AM
Creation date
10/24/2001 5:51:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/27/1999
DOCUMENT NO
PC-99-04
DOCUMENT NAME
Z-98-296
NOTES
RED BEAR, INC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-99-04 <br />Page 10 <br /> <br />41. <br /> <br />All demolition work, site improvements, and construction activities shall be <br />limited to the hours of 7:00 a.m. to 4:00 p.m., Monday through Friday. All <br />construction equipment must meet DMV noise standards and shall be equipped <br />with muffling devices. <br /> <br />42. <br /> <br />Any exhaust hoods for the kitchen shall be equipped at all times with filtering <br />devices to minimize odors and fumes. Details of said devices shall be show on the <br />plans submitted for issuance of building permits and shall be subject to review and <br />approval by the Planning Director and Director of Building Inspection prior to <br />issuance of building permits. <br /> <br />43. <br /> <br />At no time shall campers, trailers, motor homes, or any other vehicle be used as <br />living or sleeping quarters on the construction site. All such vehicles shall be <br />removed from the site at the end of each work day. <br /> <br />44. <br /> <br />There shall be no truck deliveries, parking lot sweeping, or garbage pick-up <br />between the hours of 10:00 pm and 6:00 am. <br /> <br />45. Final inspection by the Planning Department is required prior to occupancy. <br /> <br />46. <br /> <br />If archeological materials are uncovered during grading, trenching, or other on-site <br />excavation, all work on site shall be stopped and the City immediately notified. <br />The county coroner and the Native American Heritage Commission shall also be <br />notified and procedures followed as required in Appendix K of the California <br />Environmental Quality Act. A similar note shall appear on the improvement plans. <br /> <br />47. <br /> <br />Portable toilets used during construction shall be emptied on a regular basis as <br />necessary to prevent odor. <br /> <br />48. <br /> <br />Prior to issuance of a building permit, the developer shall pay the required <br />commercial development school impact fee as prescribed by state law and as <br />adopted by the Pleasanton Unified School District. <br /> <br />49. <br /> <br />The developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval <br />of this case, and that the developer agrees and acknowledges that building permit <br />approval may be withheld if sewer capacity is found by the City not to be <br />available. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.