My WebLink
|
Help
|
About
|
Sign Out
RES 01082
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2001
>
RES 01082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2001 11:23:08 PM
Creation date
8/17/2001 11:21:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/17/2001
DOCUMENT NO
RES 01082
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
62. <br /> <br />The applicant is responsible for implementing the following measures <br />during all construction phases of the subject project: <br /> <br />a.) Gather all construction debris on a regular basis and place them in a <br />dumpster or other container which is emptied or removed on a weekly <br />basis. When appropriate, use tarps on the ground to collect fallen debris or <br />splatters that could contribute to storm water pollution. <br /> <br />b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement, and storm drains adjoining the project site. During wet weather <br />avoid driving vehicles offpaved areas. <br /> <br />c.) Broom sweep the public street pavement adjoining the project site on a <br />daily basis. Caked-on mud or dirt shall be scraped from these areas before <br />sweeping. <br /> <br />d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br />drain inlet nearest the downstream side of the project site in order to retain <br />any debris or dirt flowing into the City storm drain system. Filter materials <br />shall be maintained and/or replaced as necessary to ensure effectiveness <br />and to prevent street flooding. Dispose of filter particles in the trash. <br /> <br />e.) Create a contained and covered area on the site for the storage of bags, <br />cement, paints, flammable, oils, fertilizers, pesticides, or any other <br />materials used on the project site that have the potential for being <br />discharged to the storm drain system through being windblown or in the <br />event of a material spill. <br /> <br />f.) Never clean machinery, tools, brushes, etc., or rinse containers into a <br />street, gutter, or storm drain. <br /> <br />g.) Ensure that concrete/gunite supply h'ucks or concrete/plasterers <br />operations do not discharge wash water into street gutters or drains. <br /> <br />h.) Construction access mutes shall be limited to those approved by the <br />City Engineer or Building Inspector and shall be shown on the approved <br />grading plan. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.