Laserfiche WebLink
63. <br /> <br />The applicant shall install structural control, such as an oil/water separator, <br />sand filter, or approved equal in the parking lot to intercept and pretreat <br />storm water prior to reaching the storm dram. The design, locations, and a <br />schedule for maintaining the separator shall be submitted to the City <br />Engineer/Director of Building Inspection for review and approval prior to <br />issuance of building permits. The structural control shall be cleaned at least <br />twice a year: once immediately prior to October 1 and once in January. The <br />applicant shall enter into a maintenance agreement for the oil/water <br />separator with the City. <br /> <br />4. <br /> <br />The applicant shall label all on-site storm drain inlets with the wording, <br />"No Dumping -- Drains to Bay" using City-approved methods and <br />materials. On-site storm drain facilities shall be cleaned a minimum of <br />twice a year as follows: immediately prior to October 15 and once in <br />January. Additional cleaning may be required if found necessary by the <br />City Engineer/Director of Building Inspection. <br /> <br />65. <br /> <br />The developer is encouraged to work with the City's Civic Arts <br />Commission to provide public art. <br /> <br /> <br />