Laserfiche WebLink
55. <br /> <br />56. <br /> <br />57. <br /> <br />58. <br /> <br />59. <br /> <br />60. <br /> <br />61. <br /> <br />Electric power distribution, gas distribution, communication service, cable <br />television, and any required alarm systems shall be installed underground in <br />a joint utility Wench unless otherwise specifically approved by the City <br />Engineer or Director of Building Inspection for on-site. <br /> <br />The applicant shall be responsible for the installation of the lighting system <br />serving the development. The street lights shall be 70 watt, high pressure <br />sodium vapor units mounted on galvanized steel poles with poured in place <br />bases, on the LS-1C schedule per City requirements and P.G.&E. standard <br />details, unless otherwise specifically approved. Approval for the number, <br />location, and type of electroliers shall be subject to the review and approval <br />of the City Engineer. <br /> <br />Any damage to existing street improvements during construction on the <br />subject property shall be repaired to the satisfaction of the City Engineer at <br />full expense to the developer. This shall include slurry seal, overlay, or <br />street reconstruction if deemed warranted by the City Engineer. <br /> <br />The applicant's contractor(s) shall obtain an encroachment permit from the <br />City Engineer prior to moving any construction equipment onto the site. <br /> <br />The applicant shall comply with the City's non-point storm drain ordinance. <br /> <br />Prior to commencement of any clearing, grading, or excavation, the <br />applicant shall submit to the Planning Department a copy of the State Water <br />Resources Control Board Notice of Intent (NOI) for coverage under the <br />State Construction Storm Water General Permit. <br /> <br />The applicant shall submit a construction Best Management Practice <br />(BMP) program for review and approval by the Planning Director prior to <br />issuance of any building and/or grading permits. These BMP's shall be <br />implemented by the general contractor and all subcontractors and suppliers <br />of materials and equipment. Construction site cleanup and control of <br />construction debris shall also be addressed in this program. Failure to <br />comply with the approved construction BMP may result in the issuance of <br />correction notices, citations, or a project stop work order. <br /> <br /> <br />