Laserfiche WebLink
a. Site investigations and reviews of soil and ground water test results indicate <br />no sabstantial evidence of significant hazardous waste contamination at the site. <br />Coatpliance with existing Federal and State regulations, and with the policies and <br />proSrams set forth in the Pleasanton Oenea'al Plan, will minimize the risk of future <br />conlamination resulting from land use activities on the site. The Findings under <br />Impact C4 are incorporated by reference. <br /> b. A golf course is not proposed as part of the Greenbriar Project, Phase I.. If <br />a golf course is considered'as a possible use in Phase II for the currently unplanned <br />futore public space, further environmental review will occur at that time. <br /> <br /> O. G~olo~y, Soils, and Seismic Stfety <br /> 1. ]tlti~g[.~. Material transfer requirements of the grading program result in <br /> potential impacts on traffic, roads, and air quality during construction. <br /> <br />Measure Q2a. Prior to the issuance of any building, grading, or demolition permit, the <br />applicant shall prepare for approval by the City ofPleasanton a Construction Phasing <br />and Management Plan. (Same as Measure J8.) <br />Measure Q2b. In the specific plan and as a condition of approval for development, <br />require dust control during all phases of construction. (Same as Measure KI.) <br />~: Changes or alterations have been required in, or incorporated into, the <br />Project which avoid or substantially lessen the significant environmental effect <br />identified in the Final EIR to a less than significant level. <br /> Fagts in Suvnort of Findine: The impact will be avoided or reduced based on the <br /> following: <br /> a. Mitigation Measure Q2a, requiring a Construction Phasing and Management <br /> Plan be approved by the City prior to issuance ofany building, grading, or demolition <br /> permit, is the same as Measure JS. The findings under Impact J8 are incorporated by <br /> reference. <br /> b. Mitigation Measure Q2b is the same as Measure K1. The findings under <br /> Impact K1 are incorporated by reference. <br /> <br /> c. Condition of the PUD outlines on-site practices to be conducted during <br /> grading activities. These will help mitigate the material transfer requirements of the <br /> grading program on traffic and air quality during construction. They are as follows: <br /> (1) implement comprehensive traffic control measures including scheduling to avoid <br /> peak travel hours and potential conflicts with activities at the Fairgrounds; (2) practice <br /> <br />49 <br /> <br /> <br />