Laserfiche WebLink
Measure Jgb. Require the project sponsor to develop and implement a Transportation <br />System Management Plan (TSMP) in accordance with the City of Pleasanton TSM <br />ordinance. <br />F_itll]~: Changes or alterations have been required in, or incorporated into, the <br />project which avoid or substantially lessen the significant environmental effect <br />idenlified in the Final EIR to a less than significant level. <br />Fac~ in Supoort of Finding: The impact will be avoided or reduced based on the <br />following: <br /> a~ The reduction in the number of residential units in the Greenbriar Project <br /> resets in decreased traffic demand. Pursuant to the Development Agreement, the <br /> developer will not pay any local traffic fees, but will instead fund improvements to <br /> ben~fit the Project ensure that road network in the Project vicinity will operate at <br /> acceptable levels with the addition of Project traffic. The improvements to be funded <br /> by the developer include, but are not limited to: (i) $15 million towards the 1-680 <br /> interchange improvements; (ii) the Valley Avenue railroad undercrossing; (iii) 50% of <br /> the cost of the traffic signal at Bernal Avenue at 1-680; and (iv) Bemal Bridge <br /> widening (pro rata share). <br /> b. Implementation of a TSMP is required by Mitigation Measure Jgb and <br /> implemented through PUD Condition will achieve anticipated trip generation <br /> rates, construct bus pull-out areas, and accommodate transit services on Project streets. <br /> This program will assist in minimizing the Project's traffic impacts. <br /> <br />I. Air Quality <br /> <br />1. Generation of Construction-Related Emissions. <br />~. Construction activities during site specific grading would generate dust <br />and PM- 10, creating the potential for nuisance. <br /> <br />Measure K1. Prepare and implement a dust control plan for the construction period, <br />which would control dust during all phases of construction, to be reviewed and <br />approved by the City Public Works Department prior to development activity on the <br />site. <br />F_illditlg: Changes or alterations have been required in, or incorporated into, the <br />PrOject which avoid' or substantially lessen the significant environmental effect <br />identified in the Final EIR to a less than significant level. <br /> <br />33 <br /> <br /> <br />