Laserfiche WebLink
a. Phase I locates a new station to the Central Patcel of the Project site, so that <br />most of the Project site will lie within the five-minute zone, the respol~se time to the <br />south-centrai portion of the City will be improved and the Fire Department will be able <br />to better implement its plans for Citywide comprehensive fire protection. PUD <br />Condition __ requires the Property Owner to dedicate a site in the Central Parcel, <br />adjacent to Bernal Avenue, near the Village Commons, for a new fire station. <br /> <br /> b. The City of Pleasanton intends to relocate Fire Station #1 to the Bernal <br />Property as soon as the move is feasible. The City has adopted an impact fee <br />mitigation program that will provide funds to construct the new fire station. Thc City <br />will establish alternative means of providing fire service in accordance with City <br />policy should the new station not be operational before development occurs outside the <br />five-minute response time area. Thus, Mitigati°n Measure Gla will reduce Impact <br />Gl. The timing for construction of the new fire station is at the City's discretion <br /> <br /> c. The timing and amount of development not protected by sprinklers outside <br />of the five-minute response time is subject to the City's determination of acceptable <br />risk. <br /> <br /> d. PUD Condition __ requires all buildings greater than 8,000 square feet, <br />incltlfling multi-family and commercial structures, to be equipped with automatic <br />sprinkler systems. <br /> <br /> e. Residences that cannot be served within a satisfactory response time from <br />the new fire station site to be equipped with automatic sprinkler systems. <br /> <br /> f. All construction onthe Project site must comply with Uniform Fire Code and <br />City Fire Code requirements. <br /> <br />2. ~. Cumulative increase in demand for fire protection services, leading to <br />incr~Se in the area exposed to emergency response times exceeding five minutes. <br /> <br />Measure G2a. Equip all habitable structures larger than 500 square feet with <br />automatic sprinklers. <br /> <br />Measure G2b. Require that ail of the roads into and within the project be available for <br />public access; that is, no gates should be installed to restrict traffic flows. <br /> <br />Measure G2c. Locate the fire station site on a street that has a direct connection to <br />both Sunol Boulevard and the southeastern portion of the City and Valley Avenue <br />north of the site. <br /> <br />18 <br /> <br /> <br />