My WebLink
|
Help
|
About
|
Sign Out
PC 2000-23
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2000
>
PC 2000-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:45 AM
Creation date
8/15/2001 4:59:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/12/2000
DOCUMENT NO
PC 2000-23
DOCUMENT NAME
PUD-99-03
NOTES
Kolb/Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2000-23 <br />Page 19 <br /> <br />70. <br /> <br />71. <br /> <br />72. <br /> <br />At the time that the final subdivision map is recorded, the project developer shall <br />pay their pro-rata share of the following: <br /> <br />a. The Presley Homes 770 Water Reservoir/Pump Station agreement; <br /> <br />bo <br /> <br />The Presley Homes Dublin Canyon Road improvement reimbursement agreement; <br />and, <br /> <br />Improvements to the Dublin Canyon Road/Foothill Road/Canyon Way intersection <br />per the development agreement with Hines (Wells Fargo). <br /> <br />All utilities required to serve any existing or proposed development on-site shall be <br />installed underground, unless otherwise determined by the City Engineer. <br /> <br />The project developer shall comply with the recommendations of the geoteclmical <br />report, "Preliminary Geotechnical Study, Proposed Twelve Lot Subdivision, 11393 <br />Dublin Canyon Road for Mr. Bill Kolb (Project No. JB-9753)", prepared by <br />Korbmacher Engineering, Inc., Bruno Korbmacher, P.E., dated December 31, <br />1997, and the recommendations contained in the letter from the City's <br />geotechnical peer review consultant, Berlogar Geotechnical Consultants (Raymond <br />P. Skinner, Principal Geologist) to Marion Pavan, dated October 5, 1999. The <br />project developer's geotechnical consultant shall review and approve all <br />foundation, retaining wall, and drainage geotechnical aspects of the final <br />development plans to ensure that the recommendations have been properly <br />incorporated into the development. The consultant shall certify by writing on the <br />plans or as otherwise acceptable to the Director of Building Inspection that the <br />final development plan is in conformance with the geotechnical report approved <br />with the project. <br /> <br />The project developer shall arrange and pay for the geotechnical consultant to <br />inspect and approve all foundation, retaining wall, and drainage geoteclmleal <br />aspects of project construction. The consultant shall be present on site during <br />grading and excavation operations. The results of the inspections and the as-built <br />conditions of the project shall be certified in writing by the geotechnical consultant <br />for conformance to the approved plans and geotechnical report and submitted to <br />the City Engineer and Director of Building Inspection for review and approval <br />prior to occupancy. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.