Laserfiche WebLink
Table 1. Continued <br /> <br />occur in the immediate vicinity of the find until the identified <br />appropriate actions have been taken. <br />Geology and Soils <br />S-I The City would implement the recommendations of the <br />geotechnical report to mitigate impacts from strong seismic <br />groundshaking and seismic-related ground failure. <br />Hydrology and Water Quality <br /> <br />DPW <br /> <br />WQ-1. The following stormwater pollution-prevention measures <br />shall be implemented to reduce water quality impacts on Arroyo del <br />Valle: <br /> Erosion and Sediment Control Practices: Erosion <br />and sediment control practices that may be used for the project include <br />minimizing the amount of area exposed at a given time, scheduling <br />grading and bridge work during the drier months (April to September), <br />preservation of existing vegetation to the extent practicable, temporary <br />and permanent seeding and mulching, dust control, fiber rolls, <br />stabilized construction entrances, tire washes, silt fencing, storm drain <br />inlet protection, temporary swales and sediment traps. <br /> <br /> Post-Construction Storm Water Management <br />Measures: Post-construction stormwater management measures for <br />the project may include deep-sump catch basins, vegetated swales and <br />infiltration and/or detention basins. Detention basins (if used) would <br />be designed to allow for natural habitat, where feasible (City of <br />Pleasanton Program 6.2). <br /> <br /> - Non-Storm Water Management Measures: Non- <br />storm water management measures for the project may include storage <br />of hazardous materials, chemicals, fuels, and oils and fueling of <br />construction equipment at least 150 feet away from Arroyo del Valle, <br />storing materials onsite in a neat, orderly manner in appropriate <br />containers and, if possible, under a roof or other enclosure and <br />disposing waste in accordance with the manufacturer's or the local and <br />state recommended methods for proper disposal. <br /> <br />& - SpilIPrevention and ControIMeasures: Spill <br /> <br />DPW <br /> <br />During construction <br />period <br /> <br />Prior to Section 401 <br />certification as part of the <br />NPDES process <br /> <br />DPW <br /> <br />RWQCB <br /> <br />Page 9 of 13 <br /> <br /> <br />