Laserfiche WebLink
Table 1. Continued <br /> <br />prevention and control measures for the project may include <br />containment and cleaning of spills immediately upon discovery, <br />following manufacturer's methods for spill cleanup of a material as <br />described on the Material Safety Data Sheets (MSDSs), keeping <br />materials and equipment for cleanup readily available onsite and <br />reporting toxic, hazardous, or petroleum product spills to the <br />appropriate federal, state, and local agencies. <br />Noise <br />NOI-1. The city will use an open-graded or rubberized DPW <br />asphalt overlay on Bemal Avenue fi.om the bridge to Tawny Drive. <br />The overlay will be specifically formulated to reduce tire noise <br />compared to that produced by conventional asphalt. Future street <br />rehabilitation projects on Bemal Avenue to Tawny Drive will be <br />conducted with open-graded or rubberized asphalt. <br />NO1-2 All site improvements and construction activities shall be DPW <br />limited to the hours of 8:00 a.m. to 5:00 p.m., Monday through <br />Saturday. All construction equipment must meet DMV noise <br />standards and shall be equipped with muffling devices. No <br />construction activities shall be allowed on federal holidays. <br />Transportation/Traffic <br />TR- 1 Develop and implement a traffic control plan for construction DPW <br />of the Bernal Avenue Bridge and Road Widening Project. <br /> <br />The traffic control plan may include, but would not be limited to, <br />notifying local emergency response agencies of proposed construction <br />activities and restricting construction and road closure to off-peak <br />traffic hours. Other actions that may reduce effects of construction <br />shall be identified and included in the plan. <br /> <br />During construction <br />period <br /> <br />During construction <br />period <br /> <br />Prior to construction <br /> <br />DPW <br /> <br />DPW <br /> <br />DPW <br /> <br />Page 10 of 10 <br /> <br /> <br />