My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring end Reporting Program E. Public Services: Education <br />Page 32 <br />PUBLIC SERVICES: EDUCATION <br />Mitigation Measure: E4b. ProjeM sponsor shall provide convenient and safe routes for <br />school children throughout the project area to both the elemen- <br />tary school site and the PUSD Middle School as the project <br />develops. <br />Impact to be Mitigated: Potential for safety, noise, and/or attendance area conflicts related to <br />location of school facilities. <br />Agency/individual <br />Responsible for <br />Implementation: Site and project developer(s) <br />Implementation Timing: (1) Prior to approval of the PUD Development Plan <br />(2) Ongoing during development of [he Specific Plan area <br />Mitigation Specifications: PUD Condition 62 requires the provision of safe routes for school chil- <br />dren throughout [he project to bath the elementary school site and [he <br />existing middle school. This requirement includes sidewalks, Class I <br />bikeways, onstreet bike lanes, and trails that provide access [o both school <br />sites. <br />PUD Condition 62 further requires the developer to provide a path from <br />the Valley Avenue / Street A intersection to Bernal Avenue by the time <br />there ere occupants in the residences in the southern half of the Western <br />Parcel. <br />AgencyQndividual <br />Responsible for <br />Monitoring: City of Pleasanton, Planning Department <br />Action by Monitor: (]) Verify that routes are incorporated into [he project design <br />(3) Verify that path has been completed prior [o occupancy of <br />residences in southern half of Westem Parcel. <br />Monitoring Timing: <br />(1) Prior to approval tentative maps for project components <br />(2) Prior [o approval of final map fur soulhem half of Western Parcel. <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.