My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program G. Public Services: Fire Protection <br />-- Page 33 <br />PUBLIC SERVICES: FIRE PROTECTION <br />Mitigation Measure: Gla The City will mooitor the pace of development on the Specific <br />Plan site and either construct a fire station is a timely manner <br />with respell to project construction or implement interim pro- <br />visions to meet fire safeTy needs consistent with City policy. <br />Impact to be Mitigated: Potential development beyond five-minute emergency fire department <br /> response time area From existing fire stations. <br />Agency/Individual <br />Responsible for <br />Implemeotation: City of Pleasanton, Planning Department and Livermore-Pleasanton Fire <br /> Department <br />implementation Timing: Ongoing <br />Mitigation Specifications: The City of Pleasanton and the Livermore Pleasanton Fire Department <br /> will review and monitor fire service response time. The CityCouncil will <br /> fund the construction of the fire station when needed. The City and the <br />- llepartment may also consider interim fire protection measures. <br /> The Department may undertake updated response time studies to confirm <br /> or modify [he limits of the Sve-minute response time radius. <br />Agency/Individual City of Pleasanton, Planning Department and Livcrmore-Pleasanton Fire <br />Responsible for Department <br />Monitoring: <br />- Action by Monitor: Monitor rate and locations of development, response time studies, and <br /> Capital Improvement Project funding. <br />Monitoring Timing: Annually until Fire Station #1 is relocated to the designated site or other <br /> means of fire protection are adopted for dre area(s) outside the then-cur- <br /> ren[ five-minute response time radius. <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.