Laserfiche WebLink
Mitigation Monitoring and Reporting Program B. Infrastructure Systems: Drainage <br />Page 16 <br />INFRASTRUCTURE SYSTEMS: DRAINAGE <br />Mitigation Measure: B4c. Coordinate any channel improveroent plans undertaken by <br />Zone 7 with the development of the West Parcel, if these <br />improvements can be timed in accordance with the developers' <br />timetable for development of the West Parcel. <br />Impact [o be Mitigated: Development of the project could conflict with implementation of Zone 7 <br /> regional Bood control plans fur the Arroyo de la Laguna south of the Ber- <br /> nal Avenue bridge. <br />AgencyQndividual <br />Responsible for <br />Implementation: Site and project developer(s) <br />Implementation Timing: Prior [o mass site grading. <br />Mitigation Specifications: Developer and grading contractor must work with Zone 7 to alleviate con- <br /> cerns about construction of facilities on the project site. <br />Agency/Individual <br />Responsible fur <br />Monitoring: City of Pleasanton, Public Works Departrnen[ <br />Action by Monitor: I[ is currently anticipated that the developer will begin grading and <br /> construction of improvements on [he West Parcel in advance of Zone 7 <br /> developing a Master Plan. Nevertheless, prior to commencement of <br /> grading, developer must submit written verification whether Zone 7 is <br /> prepared to proceed with the implementation of its Master Plan in <br /> conjunction with [he developers grading of the West Pazcel. Action must <br /> be repeated for each development phase [ha[ requires grading on the West <br /> Parcel. <br />Monitoring Timing: Prior [o issuance of a permit for mass site grading; prior [o issuance of <br /> permits for subsequent grading activities (as appropriate) <br />Monitor: Completion Date: Signature: <br />