My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program B. Infrastructure Systems: Drainage <br />Page 17 <br />INFRASTRUCTURE SYSTEMS: DRAINAGE <br />Mifigation Measure: BSa. Develop a stormwater quality managemeut program. <br />Impact to be Mitigated: Potential for degradation of water quality <br />AgencyQndividual <br />Responsible far <br />Implementation: Site and project developer(s) <br />Implemenmtion Timing: Prior, during, and after construction activity on the site <br />Mitigation Specifications: Prepare a stormwater qualiTy management program that conforms to the <br />Best Management Practices specified in Pleasanton's Clean Water <br />Program for urban runoff and meets [he requirements of [he NPDES <br />program with respect to construction-related pollutant dischazges. <br />Agency/Individual <br />Responsible for <br />Monitoring: <br />Action by Monitor: <br />Monitoring Timing: <br />PIID Condition 60 requires a water quality management program for <br />grading, conswction, and project operation. <br />Monitoring will be carried out as set forth in the monitoring program, and as <br />required 6y law. <br />City of Pleasanton, Public Works Department <br />(1) Review and approve stormwater quality management program. <br />(2) Monitor per stormwater quality management program.. <br />(1) Prior to approval of mass site grading permit <br />(2) Monitoring timing per stormwater quality management program. <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.