Laserfiche WebLink
Mitigation Monitoring and Reposing Program B. Infrastructure Systems: Drainage <br />Page I S <br />INFRASTRUCTURE SYSTEMS: DRAINAGE <br />Mitigation Measure: 84b. Set back development sufficiently to accommodate a Bow of <br />27,000 cfs (with WSEL of 316 feet as illustrated in DF.IR Figure <br />~ in a channel widened to the east only; if Zone 7 adopts a <br />Master Plan for regional flood control prior to the submittal of <br />the project grading plan, adjust setback consistent with that <br />plan. <br />Impact to be Mitigated: Development of the project could conflict with implementation of Zone 7 <br />regional flood control plans for the Arroyo de la Laguna south of [he Ber- <br />nal Avenue bridge. <br />Ageocy/individual <br />Responsible for <br />Implementation: Site and project developer(s) <br />Implementation Timing: Prior [o and during grading of the West Pazcel. <br />Mitigation Speciflcatioos: The August, 2000 Specific Plan project provides a setback from the main <br />channel of [he Arroyo de la Laguna of approximately 300 fee[ from the <br />[op of the eastern bank as part of the Phase 1 development Such a setback <br />leaves open a wide range of in-channel flood control improvement options <br />for Zone 7, which has recently revised its estimated future 100-year Dow <br />from 27,000 cfs to 25,500 cfs. This setback requirement is incorporated <br />in the August, 2000 Specific Plan. <br />Phase it compatibility with implementation of regional flood control plans <br /> will be evaluated in conjunction with the Yhase Il Ylan. <br />Agency/Individual <br />Responsible for <br />Monitoring: City of Pleasanton, Planning Department and Public Works Department <br />Action by Monitor: Verify setback in the adopted Phase I Plan. <br />Monitoring Timing: Prior [o approval of tentative map and site grading plan; upon completion <br /> of grading <br />Monitor: Completion Date: Signature: <br />