My WebLink
|
Help
|
About
|
Sign Out
RES 00111A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00111A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:32:27 AM
Creation date
9/11/2000 9:56:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00111
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. The GHCBI Project does not propose any development in the north eastern <br />portion of [he Central Pazcel by Pleasanton Avenue. Therefore, no traffic signal is <br />proposed to be installed with Phase I. If, during [he Phase II consideration of uses for <br />the currently unplanned public space, development is considered for this azea, further <br />environmental review will be conducted at this time to determine if a traffic signal or <br />other transportation improvements arc needed. <br />3. Impact J2. Project traffic would contribute to traffic volumes at the I-680 <br />northbound on-ramp and southbound off-ramp, contributing to unacceptable ramp <br />service levels during the AM and PM peak hours. <br />Mitieation Measures: <br />Measure 12a. Improve the I-680 northbound on-ramp at Bernal Avenue from one lane <br />to two lanes, subject to a reimbursement agreement with the City of Pleasanton; if the <br />City has sufficient funds available when the improvement is needed, then the project <br />sponsor may fund only the project's fair shaze of the improvement. <br />Measure J26. Improve the I-680 southbound off-ramp when the I-6SOBernal Avenue <br />intersection is projected to reach LOSE, or when the offramp volumes aze projected to <br />exceed the capacity of the single offramp (comprising 1,800 vehicles hour) based on <br />the City's annual short-term traffic forecast. <br />Findine: Changes or alterations have been required in, or incorporated into, the <br />project which avoid or substantially lessen the significant environmental effect <br />identified in the Final EIR to a less than significant level. <br />Facts in Suooort of Findine: The impact will be avoided or reduced based on the <br />following: <br />a. PLTD Condition will ensure [ha[ an additional lane is added to the <br />northbound on-ramp resulting in acceptable conditions under future scenarios with [he <br />GHCBI Project and cumulative development as documented in FEIR Table 63. In <br />addition, the GHCBI Project Phase I proposes fewer residential units than the <br />Cooperative Plan or the Yreferrcd Plan, so traffic impacts will also be reduced. <br />b. PUD Condition will ensure that when the I-680 southbound off-ramp is <br />projected to exceed the capacity of the existing off-ramp, or the ramp intersection with <br />Bernal Avenue is projected to reach LOS E, improvements will be constructed to <br />increase the capacity of this off-ramp to maintain LOS D levels under future scenazios <br />with the GHCBI Project and cumulative as documented in FEIR Table 63. Pursuant to <br />[he Development Agreement, GHCBI will pay $15 million towards such interchange <br />improvements. <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.