Laserfiche WebLink
ment plans have been submitted for review within <br />the time period specified above, shall be deemed <br />void and the fee which has been paid shall be <br />deemed forfeited. <br /> <br />a. H__o_l_dA~_g..~_a_nk_~'. <br /> <br />All existing holding tanks that have <br />sewers available to them shall pay the <br />necessary sewer connection fee within <br />two weeks of the adoption of this <br />resolution~ and must be connected to <br />said sewer line within 30 days from the <br />date of adoption of this resolution. <br />.bay tanks not so connected shall be <br />deemed to have forfeited the sewer con- <br />nection fee which has been maid and a <br />new sewer connection fee shall be re--, <br />quired. <br /> <br />(2) <br /> <br />Existing holding tanks which do not have <br />sewers available to them must pay the <br />required sewer connection fee within <br />30 days of the adoption of this resolu-~ <br />tion and must construct any necessary <br />sewer lines and connect to the sewer <br />system within 4 months of the date of <br />adoption of this resolution. Any holding <br />tank unit not so connected pursuant to <br />this subsection within the time period <br />specified above, shall be deemed to have <br />forfeited its sewer connection fee and <br />a new sewer connection fee be required. <br /> <br />The 5 Equivalent Sewer Units reserved for the <br />City and County of San Francisco shall be so <br />reserved for a period of 6 months. If~ at <br />the end of said 6 month period the necessary <br />sewer connection fees and building plans <br />respectfully have not been paid and submitted <br />to the Building' Division of the Department of <br />Housing and Community Development, the City <br />Council may at its discretion re-allocate these <br />units to any other category set forth in this <br />resolution. <br /> <br />The 16 unspecified Equivalent Sewer Connection <br />Units shall be reserved for industrial and <br />commercial developers for a period of 4 months <br />from the date of adoption of this resolution. <br />Said units shall be distributed to developers <br />only upon conclusion of Design Review approval <br />and payment of the necessary sewer connection <br />fee. Building miens shall be submitted to the <br />Building Division of the Department of timusing <br />and Community Development within the above <br />time limit, otherwise the fees which have been <br /> <br /> <br />