Laserfiche WebLink
Financing Program #2. Upon approval of a tentative map, the City may allow partial <br />infrastructure extensions within Parts 1,2. and 3 if: <br /> <br />(a) <br /> <br />the Lot to be developed would be fully served with all planned <br />infrastructure extended from the westerly end of the Plan Area: and <br /> <br />(b) <br /> <br />the total Specific Plan fees generated by the Lot to be developed are <br />insufficient, when aggregated with monies in the Specific Plan fund. to <br />allow all infrastructure required in that sub-area to be fully installed. <br /> <br />Example 2 A. Lot 10 is the first lot wishing to develop. It must extend the Part 1 <br />infi'astructure from the westerly end of the Plan Area across its frontage. Lot <br />10 's four units do not generate funds sufficient to extend the i~frastructure .[hrther <br />(there being no existing Specific Plan funds). The Part I sewer and roadway <br />improvements may stop at Lot 10 and need not be installed easter6, to Lot 15. the <br />easterly edge of the Part 1 sub-area. <br /> <br />The elementary school (located at the westerly edge of the Part 4 sub-area on Lot 19) is a <br />key element of the Specific Plan whose early development is encouraged. Should the <br />school seek to develop prior to Parts I -4 private development. it will require some. but <br />not all, of the infrastructure required of other Part 4 projects. <br /> <br />Financing Program #3. Development of the elementary school may proceed <br />independently of any other development in the Plan Area with a minimum level of shared <br />infrastructure improvements. The City may coordinate with the School District by using <br />its utility enterprise capital improvement funds to assist in installing the minimum level <br />of infrastructure. Both the School District and the City would be eligible for <br />reimbursement as described in Financing Program #20. Minimal improvements required <br />are: <br /> <br />(a) <br /> <br />Construction of the 16-inch water trunk line in the existing Vineyard <br />Avenue, and Zone 7 Turn-out #6 modifications: <br /> <br />(b) <br /> <br />Construction of all shared sanitary sewer improvements west of the school <br />site, or, on a temporary basis, installation of an on-site sewage holding <br />tank: <br /> <br />(c) <br /> <br />Realignment of Vineyard Avenue from Lot l 5 to the eastern Plan Area <br />boundary; and <br /> <br />(d) <br /> <br />Construction of a sidewalk along the south side of Vineyard Avenue from <br />Lot 1 to its intersection with the abandoned old Vineyard Avenue. <br /> <br />3 <br /> <br /> <br />