Laserfiche WebLink
ALLOCATION OF COSTS <br /> <br />The basic principles in the Specific Plan are as follows: <br /> · each planned new housing unit shall share equally with all others in the <br /> construction of the shared infrastructure: <br /> · each existing housing unit shall share equally with new units for the new <br /> infrastructure it uses; and <br /> · non-residential uses shall share equally with the residential units based on the <br /> intensity of their use of the infrastructure. <br />These principles will be implemented over time by adhering to the provisions of this <br />Financing Program. <br /> <br />Financing Program #,4. Each Lot is allocated its pro rata share of the total shared <br />infrastructure improvements based on the assumed development both within and outside <br />of the Specific Plan Area which contribute to the need for the shared infrastructure <br />improvements. <br /> <br />(a) <br /> <br />Lot shares for each Lot in the Specific Plan Area are shown in Table 2. <br />The total shares shown in Table 2 for each Lot are fixed: no modification <br />to Table 2 or any Lot's pro rata share will be made notwithstanding <br />whether: <br /> <br />(i) <br /> <br />(ii <br /> <br />the Lot is actually developed with fewer final lots than assumed in <br />the Specific Plan; or <br />the Lot is developed with another use allowed in the Specific Plan <br />which may have different infrastructure impacts (e.g.. church, day <br />care center, etc.). <br /> <br />(b) <br /> <br />Out-of-area contributors are projects which have been determined. or mav <br />be in the future, to contribute to the need for, and benefit from. the sharefi <br />infrastructure improvements. Shares attributed to out-of-area contributors <br />are shown in Table 2. <br /> <br />(i) <br /> <br />Ruby Hill: assigned atotal share of road costs equal to 40% of the <br />Specific Plan Area roadway costs. (Ruby Hill has constructed <br />road, water line, and sewer shared infrastructure improvements for <br />which it will receive a credit toward its total obligation. Payment <br />of its remaining obligation will be in accordance with a subsequent <br />agreement to be reached between Signature Properties and the <br />City.) Ruby Hill is not assigned EDUs per se; the total roadway <br />cost to Plan Area properties has been reduced by the amount of <br />Ruby Hill's contribution. <br /> <br />4 <br /> <br /> <br />