Laserfiche WebLink
d. Coordination and direction will involve work effort by <br /> <br />Kennedy Engineers, Inc. in carrying out and directing the efforts of sub- <br />contractors performing surveys, soils and corrosion study. <br /> <br />Kennedy Engineers, Inc. <br /> <br /> Cost Reimbursement Budget <br /> Fixed Fee <br /> <br /> Total <br /> <br /> $ 2,611.15 <br /> <br />k <br /> 1,584.85 <br /> <br /> $ 4,196.00 <br /> <br />Total Budget Cost Field Information <br /> <br />$36,014.00 <br /> <br /> 2. Design and Plan and preparation (Step 2) <br /> Design, prepare plans and specifications, make cost estimates, <br />prepare preliminary drafts of Operation and Maintenance Manual, and provide <br />reduced scale drawings and bound specifications for bidding and distribution, <br />assist the City during the bidding process including filing of bid results <br />with the State and making recommendations to the City as to s~ard. Number <br />of copies of reduced size plans and specifications to be provided ~0r bidding <br />based on 100 sets. Engineer will prepare ten (10) copies each of preliminary <br /> <br />draft of O&M Manual. <br /> <br />Kennedy Engineers, Inc. <br /> <br /> Cost Reimbursement Budget <br /> Fixed Fee <br /> <br />Total Budget Cost Step 2 <br /> <br />$175,395-00 <br /> <br /> 24,595.00 <br />$199,990.0.q <br /> <br />~ese costs are more particularly described in Exhibit "B" attached hereto <br />(Form 5700-41, with attachments)- <br /> <br /> A. payment to the ENGINEER for the work included in paragraph <br />B of this agreement~-~ll be on the basis of cost reimbursement plus a fixed <br />fee. As consideration for providing the services enumerated, the City shall <br /> <br />-4- <br /> <br /> <br />